flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

California State University Long Beach’s new dormitory is one of California’s most sustainable

University Buildings

California State University Long Beach’s new dormitory is one of California’s most sustainable

Gensler designed the project.


By David Malone, Managing Editor | August 9, 2021
Parkside North on CSULB

Renderings courtesy Gensler

California State University Long Beach (CSULB) has completed the first student housing project on the campus in 34 years. Dubbed the Hillside Gateway building, the project is located on the Northwest side of campus, where Atherton Street and Earl Warren Drive meet. The project also included the construction of the new Housing Administration Office.

The entire project is LEED Platinum with the housing portion obtaining a partial Petal Certification for Living Building Challenge project certification. The Administration Building will receive certification for FULL Living Building Challenge. It is only the third project in California to receive this level of sustainability and the 23rd in the world.

 

CSULB active space

 

The project includes a state-of-the-art mechanical design that incorporates the latest high efficiency Variable Refrigerant Volume technology. Additionally, 100% of the site’s stormwater will be managed on site through capture and/or infiltration with ground water recharge.

The completed 90,000-sf, four-story housing building includes 472 beds, pod study rooms, kitchens, and community space. The dormitory is a figure-eight shape, which allows for courtyards with benches, seating, and hammocks.

 

CSULB Administration Building

 

The 15,000-sf Administration building features common spaces, open kitchen areas, music practice rooms, and office space. A heat recovery system takes excess heat from equipment, occupants, and lighting and moves it to rooms with windows and exterior walls, improving the energy efficiency during the winter months.

Gensler was the project’s architect, Glumac was the criteria engineer, and McCarthy Building Companies was the design builder.

 

CSULB Lounge

 

CSULB Rooftop Perch

 

CSULB Garden Entry

Related Stories

Giants 400 | Aug 28, 2020

2020 Giants 400 Report: Ranking the nation's largest architecture, engineering, and construction firms

The 2020 Giants 400 Report features more than 130 rankings across 25 building sectors and specialty categories.

University Buildings | Aug 27, 2020

Eight strategies for achieving successful P3 development models

Transparency and communication are imperative, says new white paper on these agreements.

University Buildings | Aug 20, 2020

Student housing in the COVID-19 era

Student housing remains a vital part of the student and campus experience.

University Buildings | Aug 3, 2020

5 reasons universities are renovating student housing

Clark Nexsen’s Student Life practice leader, Peter Aranyi, discusses the benefits of renovation and why it offers particular value to campuses nationwide.

University Buildings | Aug 2, 2020

R&D hubs, modular-built hotels, and an award-winning student center on the August 6 “The Weekly”

R&D hubs, modular-built hotels, and an award-winning student center on the August 6 “The Weekly”

University Buildings | Jul 24, 2020

A hybrid learning approach could redefine higher education

Universities reassess current assets to determine growth strategies.

Laboratories | Jul 24, 2020

Customized labs give universities a recruiting edge

CO Architects is among a handful of firms that caters to this trend.

boombox1
boombox2
native1

More In Category

Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021