flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

California State University Long Beach’s new dormitory is one of California’s most sustainable

University Buildings

California State University Long Beach’s new dormitory is one of California’s most sustainable

Gensler designed the project.


By David Malone, Managing Editor | August 9, 2021
Parkside North on CSULB

Renderings courtesy Gensler

California State University Long Beach (CSULB) has completed the first student housing project on the campus in 34 years. Dubbed the Hillside Gateway building, the project is located on the Northwest side of campus, where Atherton Street and Earl Warren Drive meet. The project also included the construction of the new Housing Administration Office.

The entire project is LEED Platinum with the housing portion obtaining a partial Petal Certification for Living Building Challenge project certification. The Administration Building will receive certification for FULL Living Building Challenge. It is only the third project in California to receive this level of sustainability and the 23rd in the world.

 

CSULB active space

 

The project includes a state-of-the-art mechanical design that incorporates the latest high efficiency Variable Refrigerant Volume technology. Additionally, 100% of the site’s stormwater will be managed on site through capture and/or infiltration with ground water recharge.

The completed 90,000-sf, four-story housing building includes 472 beds, pod study rooms, kitchens, and community space. The dormitory is a figure-eight shape, which allows for courtyards with benches, seating, and hammocks.

 

CSULB Administration Building

 

The 15,000-sf Administration building features common spaces, open kitchen areas, music practice rooms, and office space. A heat recovery system takes excess heat from equipment, occupants, and lighting and moves it to rooms with windows and exterior walls, improving the energy efficiency during the winter months.

Gensler was the project’s architect, Glumac was the criteria engineer, and McCarthy Building Companies was the design builder.

 

CSULB Lounge

 

CSULB Rooftop Perch

 

CSULB Garden Entry

Related Stories

Giants 400 | Aug 13, 2019

2019 Science + Technology Giants Report: Operational flexibility is a must for S+T buildings

The science and technology (S+T) sector is arguably the industry’s most complex because it caters to a diverse clientele with specific priorities and imperatives, according to Building Design+Construction's 2019 Giants 300 Report.

University Buildings | Aug 8, 2019

New Student Wellness Center at the University of Chicago begins construction

Wight & Company is providing design-build services for the project.

University Buildings | Jul 10, 2019

Campus costs: Square foot construction prices for student unions

Using RSMeans data from Gordian, here are the most recent costs per square foot of college student unions in 10 college cities across the U.S. 

University Buildings | Jul 3, 2019

Duke’s new Chinese campus sits atop a manmade lake

Gensler and LandDesign designed the project.

University Buildings | Jul 2, 2019

New Biomedical Research Center Facility at Northwestern University

Designed by Perkins+Will, the Louis A. Simpson and Kimberly K. Querrey Biomedical Research Center has spaces aiding medical discovery.

Contractors | Jun 15, 2019

Turner tops off new classroom space at Middle Tennessee State University

The building includes a “command center” for training students to interact with emergency personnel.

boombox1
boombox2
native1

More In Category

Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021