As the anchor building of a new branch campus for Washington State University, the 95,000-sf Everett University Center plays a crucial role in providing STEM-based baccalaureate and graduate programs to the North Puget Sound region. Previously, this area had been underserved by higher education opportunities for low- and middle-income families. The facility is the inaugural building of a master-planned campus.
The EUC is designed to engage students, local businesses, and the community. The four-story atrium serves as an interior street and is fronted by key student support elements with multiple “storefronts” for student services, a tiered lecture hall, classroom, and the Capstone Studio, an upper-division lab providing students and industry partners a place for invention and innovation. Large bifold doors in the lab spaces open to a paved outdoor workspace for lab work, demonstrations, and community participation.
The atrium is adorned with a striking cantilevered Douglas Fir staircase as a nod to the storied history of the Pacific Northwest timber industry and a statement of modern engineering. The wood stair structure is made of 5/8-inch-thick lamella, custom bent and glued to create sinuous full-length spans for the stringers spanning up to 44 feet.
Green features in this LEED Gold-registered building are on display throughout. The photovoltaic panels are showcased along the roofline on the southern façade. Supported by a cantilevered steel subframe, the PVs extend 10 feet beyond the face of the building, as a modern interpretation of a cornice. A dashboard in the lobby displays real-time PV productivity and the building’s energy consumption.
The atrium is naturally cooled and ventilated with mechanically operable windows and louvers. During winter months, heat energy is harvested from the building’s data center and reused in the atrium’s hydronic radiant floor. Rainwater is captured in a below-grade cistern and repurposed for toilet flushing and irrigation.
Building Team — Submitting firm, architect SRG Partnership Owner Washington State University Structural engineer KPFF Consulting Engineers MEP engineer McKinstry General contractor Hoffman Construction
General Information — Size 95,000 sf Construction cost $64.6 million Construction time July 2015 to May 2017 Delivery method Design-build
Return to the 2018 Building Team Awards Landing Page
Related Stories
Building Team Awards | Jun 12, 2019
Delectable design: A traditional French pastry was the concept behind the Krause Gateway Center
Gold Award: Krause Gateway Center’s striking design takes its cue from the traditional French dessert mille feuille.
Building Team Awards | Jun 11, 2019
Learning by doing: Students took an active role in the design of the Bay Area's d.tech high school
Gold Award: D.tech had been occupying temporary spaces that were hardly suited for design thinking.
Building Team Awards | Jun 10, 2019
Technology showcase: PTC's new digs combine lively workspaces with exhibits for its products and platforms
Gold Award: PTC began its fitout even as 121 Seaport was still under construction.
Building Team Awards | Jun 7, 2019
Fast delivery: Construction of McDonald's global headquarters was completed in under seven months
Gold Award: The building has a remarkably diverse array of spaces that include “work neighborhoods.”
Building Team Awards | Jun 7, 2019
Unifying force: A place where a million Tulsans can connect, one by one
Platinum Award: Gathering Place is a 66½-acre public park and playground serving the nearly one million residents of greater Tulsa, Okla.
Building Team Awards | May 24, 2018
Green machine: Janet Durgin Guild and Commons at Sonoma Academy
Honorable Mention: A college prep school gets an uber-green maker space and cooking lab.
Building Team Awards | May 24, 2018
Good neighbor: Wentz Science Center at North Central College
Bronze Award: A conscientious Building Team takes steps to minimize the impact of this large-scale science center project in a historic neighborhood.
Building Team Awards | May 23, 2018
13 projects earn BD+C's 2018 Building Team Awards
Iowa’s game-changing correctional institution and Chicago’s daring hotel and sports development are among 13 projects to earn honors in BD+C’s 2018 Building Team Awards.
Building Team Awards | May 23, 2018
Engineered for extremes: Talan Towers
Bronze Award: Astana’s shimmering mixed-use towers are made to stand up to the region’s harsh, long winters.
Building Team Awards | May 22, 2018
High-tech haven: The Spark at Washington State University
Silver Award: A ‘teaching in the round’ classroom highlights this innovation hub at Washington State University’s Pullman campus.