When it opens in 2026, Ādisōke is expected to be one of the largest library and archive facilities in the world.
With work now underway, the 216,000-square-foot, $326 million facility will house the Ottawa Public Library’s new central branch as well as Canada’s national library and archives. Ādisōke will offer free and open access to millions of documents and Canada’s documentary heritage. It will be the first new building in the Parliamentary District in nearly 30 years.
The design by Diamond Schmitt joins the two spaces with an expansive public forum that provides visitors with various services, exhibitions, and meeting spaces. The design references Ottawa’s heritage and natural terrain. The use of Ontario limestone to clad the building echoes the slopes along the site’s adjacent canals, and wood is used both structurally and aesthetically. The facility’s curvilinear roof reflects the flow of the Kichi Sipi Ottawa River.
Diamond Schmitt’s design is the result of an in-depth engagement process that foregrounded Indigenous stories and histories, as well as Canadian heritage. After researching the facility’s site—a historical meeting place for the Anishinābe Algonquin people—the Ādisōke Project Team recognized the need to engage both the people of Ottawa and the region’s Indigenous communities from the start. Elders and members of the land’s Host Nation named the site Ādisōke, an Anishinābemowin word that refers to storytelling. More than 7,000 people—including residents, Indigenous peoples, and Canadians from coast to coast to coast—have contributed to the engagement process.
“From the moment we began collaborating with the Ādisōke Project Team, the public, and Indigenous communities on this design, our work has been guided by the communities it serves,” Gary McCluskie, principal, Diamond Schmitt, said in the statement.
The five-story, fully accessible facility is also on track to reach net zero carbon emissions—the first public building of its kind in Canada, according to a press statement. In a joint venture with Ottawa-based KWC Architects, Diamond Schmitt designed the interior and exterior with advanced energy saving systems, a green roof, and strategically located skylights.
On the Building Team:
Design architect and architect of record: Diamond Schmitt Architects
MEP engineer: Arup
Structural engineer: Fast + Epp
General contractor/construction manager: PCL
Related Stories
| Sep 16, 2013
Study analyzes effectiveness of reflective ceilings
Engineers at Brinjac quantify the illuminance and energy consumption levels achieved by increasing the ceiling’s light reflectance.
| Sep 11, 2013
BUILDINGChicago eShow Daily – Day 3 coverage
Day 3 coverage of the BUILDINGChicago/Greening the Heartland conference and expo, taking place this week at the Holiday Inn Chicago Mart Plaza.
| Sep 10, 2013
BUILDINGChicago eShow Daily – Day 2 coverage
The BD+C editorial team brings you this real-time coverage of day 2 of the BUILDINGChicago/Greening the Heartland conference and expo taking place this week at the Holiday Inn Chicago Mart Plaza.
| Aug 26, 2013
What you missed last week: Architecture billings up again; record year for hotel renovations; nation's most expensive real estate markets
BD+C's roundup of the top construction market news for the week of August 18 includes the latest architecture billings index from AIA and a BOMA study on the nation's most and least expensive commercial real estate markets.
| Aug 22, 2013
Energy-efficient glazing technology [AIA Course]
This course discuses the latest technological advances in glazing, which make possible ever more efficient enclosures with ever greater glazed area.
| Aug 14, 2013
Green Building Report [2013 Giants 300 Report]
Building Design+Construction's rankings of the nation's largest green design and construction firms.
| Jul 29, 2013
2013 Giants 300 Report
The editors of Building Design+Construction magazine present the findings of the annual Giants 300 Report, which ranks the leading firms in the AEC industry.
| Jul 22, 2013
Cultural Facility Report [2013 Giants 300 Report]
Building Design+Construction's rankings of design and construction firms with the most revenue from cultural facility projects, as reported in the 2013 Giants 300 Report.
| Jul 19, 2013
Renovation, adaptive reuse stay strong, providing fertile ground for growth [2013 Giants 300 Report]
Increasingly, owners recognize that existing buildings represent a considerable resource in embodied energy, which can often be leveraged for lower front-end costs and a faster turnaround than new construction.
| Jul 18, 2013
GSA regains stature under Tangherlini, who looks to trim its holdings, cut energy costs [2013 Giants 300 Report]
Over the past 15 months, Acting GSA Administrator Dan Tangherlini has done a creditable job of restoring the agency’s standing with Congress and the public.