flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Canada to open one of the world’s largest library and archive facilities

Libraries

Canada to open one of the world’s largest library and archive facilities

The facility’s design resulted from an in-depth engagement with Indigenous peoples.


By Novid Parsi, Contributing Editor | July 20, 2022
Adisoke North View
Adisoke North View. Courtesy of Diamond Schmitt.

When it opens in 2026, Ādisōke is expected to be one of the largest library and archive facilities in the world. 

With work now underway, the 216,000-square-foot, $326 million facility will house the Ottawa Public Library’s new central branch as well as Canada’s national library and archives. Ādisōke will offer free and open access to millions of documents and Canada’s documentary heritage. It will be the first new building in the Parliamentary District in nearly 30 years. 

The design by Diamond Schmitt joins the two spaces with an expansive public forum that provides visitors with various services, exhibitions, and meeting spaces. The design references Ottawa’s heritage and natural terrain. The use of Ontario limestone to clad the building echoes the slopes along the site’s adjacent canals, and wood is used both structurally and aesthetically. The facility’s curvilinear roof reflects the flow of the Kichi Sipi Ottawa River. 

Diamond Schmitt’s design is the result of an in-depth engagement process that foregrounded Indigenous stories and histories, as well as Canadian heritage. After researching the facility’s site—a historical meeting place for the Anishinābe Algonquin people—the Ādisōke Project Team recognized the need to engage both the people of Ottawa and the region’s Indigenous communities from the start. Elders and members of the land’s Host Nation named the site Ādisōke, an Anishinābemowin word that refers to storytelling. More than 7,000 people—including residents, Indigenous peoples, and Canadians from coast to coast to coast—have contributed to the engagement process.

“From the moment we began collaborating with the Ādisōke Project Team, the public, and Indigenous communities on this design, our work has been guided by the communities it serves,” Gary McCluskie, principal, Diamond Schmitt, said in the statement.

The five-story, fully accessible facility is also on track to reach net zero carbon emissions—the first public building of its kind in Canada, according to a press statement. In a joint venture with Ottawa-based KWC Architects, Diamond Schmitt designed the interior and exterior with advanced energy saving systems, a green roof, and strategically located skylights. 

On the Building Team:
Design architect and architect of record: Diamond Schmitt Architects
MEP engineer: Arup 
Structural engineer: Fast + Epp
General contractor/construction manager: PCL

Adisoke South View
Adisoke South View. Courtesy of Diamond Schmitt.
LAC Reading Room
Library and Archives Canada Reading Room. Courtesy Diamond Schmitt.

 

Related Stories

| Aug 11, 2010

Community college’s hillside learning center

The Earl E. and Dorothy J. Dellinger Learning Resource Center at Southwest Virginia Community College in Richlands, Va., is the centerpiece of this mountainside school. Designed by Arlington, Va.-based The Lukmire Partnership, the 50,000-sf, two-story building connects the upper and lower campuses, which are separated by a 70-foot vertical grade change.

| Aug 11, 2010

BIG beats out Foster and Hadid in design competition for Kazakhstan's National Library

Invited as one of five pre-selected architect-led teams that included Lord Norman Foster and Zaha Hadid, Copenhagen-based BIG was awarded first prize in an international design competition for the new National Library in Astana, Kazakhstan. The 33,000-square-meter facility will be organized as a “circular loop of knowledge” that allows for clear, intuitive orientation of the vast co...

| Aug 11, 2010

Modest recession for education construction

Construction spending for education expanded modestly but steadily through March, while at the same time growth for other institutional construction had stalled earlier in 2009. Education spending is now at or near the peak for this building cycle. The value of education starts is off 9% year-to-date compared to 2008.

| Aug 11, 2010

Concrete Solutions

About five or six years ago, officials at the University of California at Berkeley came to the conclusion that they needed to build a proper home for the university's collection of 900,000 rare Chinese, Japanese, and Korean books and materials. East Asian studies is an important curriculum at Berkeley, with more than 70 scholars teaching some 200 courses devoted to the topic, and Berkeley's pro...

Cultural Facilities | Aug 11, 2010

12 major trends in library design

Many academic planners assumed that the coming of the Internet would lead to the decline of the library as we know it. To the contrary, many academic libraries have experienced significantly increased patron use in recent years.

| Aug 11, 2010

Giants 300 University Report

University construction spending is 13% higher than a year ago—mostly for residence halls and infrastructure on public campuses—and is expected to slip less than 5% over the next two years. However, the value of starts dropped about 10% in recent months and will not return to the 2007–08 peak for about two years.

| Aug 11, 2010

Let There Be Daylight

The new public library in Champaign, Ill., is drawing 2,100 patrons a day, up from 1,600 in 2007. The 122,600-sf facility, which opened in January 2008, certainly benefits from amenities that the old 40,000-sf library didn't have—electronic check-in and check-out, new computers, an onsite coffeehouse.

| Aug 11, 2010

Fleet Library, Rhode Island School of Design

When tasked with transforming an early 1920s Italian Renaissance bank building into a fully functional library for the Rhode Island School of Design, the Building Team for RISD's Fleet Library found itself at odds with the project's two main goals. On the one hand, the team would have to carefully restore and preserve the historic charm and ornate architectural details of the landmark space, d...

boombox1
boombox2
native1

More In Category

Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021