flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Casablanca Finance City Tower becomes Morphosis’ first project in Africa

High-rise Construction

Casablanca Finance City Tower becomes Morphosis’ first project in Africa

The tower is the first building completed in Casablanca Finance City.


By David Malone, Associate Editor | January 20, 2021
CFC Tower exterior at night

All photos: Jasmine Park

The 25-story Casablanca Finance City Tower has become the first project to be completed in the newly-established Casablanca Finance City, a new business district being developed in Morocco's Anfa District.

The Casablanca Finance City Tower’s design draws on the openness of the surrounding area, which gave the designers the opportunity in an otherwise dense city to highlight the relationship between the building and the natural environment. 

 

CFC facade

 

“The Casablanca Finance City Tower and its innovative design was conceived to have long-lasting impact and to signal a new era of economic prosperity for Morocco,” said Morphosis Founding Partner Thom Mayne in a release. “This tower brings together a range of global industries in the heart of the country, galvanizing international investment in North Africa, while also providing a template for the future development of the district as it continues to grow.”

 

Casablanca City Finance Tower interior elevator

 

A brise-soleil system wraps the building to protect against the sun while allowing the building to harness external elements to regulate natural light, air, and temperatures internally. The facade draws inspiration from traditional geometric patterned mosaics and wooden latticework screens characteristic of Moroccan architecture.

A tapered crown tops the 400-foot structure, while at street level the building engages the lower urban landscape with exterior public programming that invites the community into adjacent public spaces. This allows the building to serve as both a symbol of the city’s development and as a social hub that nurtures an active street life in the district.

Casablanca Finance City Tower is designed to achieve all LEED Gold certification.

 

CFC Tower ground level exterior

Related Stories

| May 15, 2012

One World Trade Center goes to new height of sustainability

One of the biggest challenges in developing this concrete mixture was meeting the Port Authority of New York/New Jersey’s strict requirement for the replacement of cement.

| May 14, 2012

SOM to break ground on supertall structure in China

The 1,740-feet (530-meter) tall tower will house offices, 300 service apartments and a 350-room, 5-star hotel beneath an arched top.

| May 14, 2012

Adrian Smith + Gordon Gill Architecture design Seoul’s Dancing Dragons

Supertall two-tower complex located in Seoul’s Yongsan International Business District.

| May 1, 2012

Time-lapse video: World Trade Center, New York

One World Trade Center, being built at the site of the fallen twin towers, surpassed the Empire State Building on Monday as the tallest building in New York.

| Apr 27, 2012

China Mobile selects Leo A Daly to design three buildings at its new HQ

LEO A DALY, in collaboration with Local Design Institute WDCE, wins competition to design Phase 2, Plot B, of Campus.

| Apr 25, 2012

McCarthy introduces high school students to a career in construction

High school students from the ACE Mentoring Program tour the new CHOC Children’s Patient Tower in Orange, Calif.

| Apr 25, 2012

J.C. Anderson selected for 50,000-sf build out at Chicago’s DePaul University

The build-out will consist of the construction of new offices, meeting rooms, video rooms and a state-of-the-art multi-tiered Trading Room.

| Apr 24, 2012

ULI Real Estate Consensus Forecast, projects improvements for the real estate industry through 2014

Survey is based on opinions from 38 of the nation’s leading real estate economists and analysts and suggests a marked increase in commercial real estate activity, with total transaction volume expected to rise from $250 billion in 2012 to $312 billion in 2014.

| Apr 23, 2012

Innovative engineering behind BIG’s Vancouver Tower

Buro Happold’s structural design supports the top-heavy, complex building in a high seismic zone; engineers are using BIM technology to design a concrete structure with post-tensioned walls.

| Apr 10, 2012

Moriarty & Associates selected as GC for Miami’s BrickellHouse Condo

Construction of the 46-story development is schedule to get underway this summer and be completed in 2014.

boombox1
boombox2
native1

More In Category




Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021