Centennial Yards Company has topped out The Mitchell, the first residential tower of Centennial Yards, a $5 billion mixed-use development in downtown Atlanta. Construction of the apartment building is expected to be complete by the middle of next year, with first move-ins slated for summer 2025.
Designed by Atlanta-based architecture firms TVS and Goode Van Slyke Architecture (GVSA), the 19-story building will provide 304 modern, design-forward apartments ranging from studios to three-bedroom residences. The open-layout residences will feature kitchens with premium-grade appliances, plus floor-to-ceiling windows and balconies with views of the Atlanta skyline.
The building’s full floor of residential amenities will include a pool with event lawn and grilling stations, on-site coworking spaces, dog run with pet spa, and fitness center with lounge, as well as 16,000 sf of street-level retail space.
The Mitchell is located across from Mercedes-Benz Stadium and adjacent to the Atlanta Hawks’ State Farm Arena.
Centennial Yards also expects to top out a 19-story, 292-key boutique hotel later this year. Across the street from The Mitchell, Centennial Yards recently broke ground on the sports and entertainment district that will bring about 470,000 sf of entertainment, retail, and restaurant space to a 7.5-acre site adjacent to the Five Points MARTA station, connecting the site with the rest of the city. In partnership with Cosm, an immersive technology, media, and entertainment company, Centennial Yards also plans to deliver a 70,000-sf, three-level immersive entertainment venue.
In all, the 50-acre, mixed-use Centennial Yards project will create several new city blocks, public open space, and up to 12 million sf of new retail, hotel, and residential buildings and sports and entertainment venues.
On the Building Team:
Architects of record: TVS and Goode Van Slyke Architects (GVSA)
MEP engineer: Salas O’Brien
Structural engineers: Thornton Tomasetti and Sykes Consulting
Construction manager: CIM Group
Related Stories
| Jun 1, 2012
New BD+C University Course on Insulated Metal Panels available
By completing this course, you earn 1.0 HSW/SD AIA Learning Units.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| May 23, 2012
Summit Design+Build selected as GC for Chicago restaurant
Little Goat will truly be a multifunctional space. Construction plans include stripping the 10,000 sq. ft. building down to the bare structure everywhere, the installation of a new custom elevator and adding square footage at the second floor with an addition.
| Apr 30, 2012
HSA Commercial selected as consultant for Orland Park’s Main Street Triangle project
HSA will be responsible for designing an overall mixed-use merchandise plan, attracting a unique retail tenant mix and completing leases with prospective tenants.
| Apr 20, 2012
Shawmut completes Yard House Restaurant in Boston
12,000-sf restaurant marks new addition to Boston’s Fenway neighborhood.
| Apr 6, 2012
Batson-Cook breaks ground on hotel adjacent to Infantry Museum & Fort Benning
The four-story, 65,000-ft property will feature 102 hotel rooms, including 14 studio suites.
| Apr 4, 2012
JCJ Architecture designs New York City's first casino
Aqueduct Racetrack complex transformed into modern entertainment destination.
| Apr 3, 2012
Luxury hotel 'groundscraper' planned in abandoned quarry
Would you spend $300 a night to sleep underground? You might, once you see the designs for China's latest hotel project.
| Mar 16, 2012
Temporary fix to CityCenter's Harmon would cost $2 million, contractor says
By contrast, CityCenter half-owner and developer MGM Resorts International determined last year that the Harmon would collapse in a strong quake and can't be fixed in an economical way. It favors implosion at a cost of $30 million.