The ruins of the 80-room Hot Wells Hotel and Bathhouse in San Antonio, a popular destination in the area in the years prior to World War I, are currently undergoing a transformation into a public park.
Phase one of the project, which involved stabilizing the existing structures, creating a park entrance and signage, building public bathrooms, and extending utilities to the buildings, has recently completed. The second phase will create outdoor rental spaces and new landscaping and trails that connect the park to the Mission Reach of the San Antonio River.
Phase two will also turn the hotel’s ruins into a community space. A demonstration kitchen, a mini museum that details the site’s past, a visitor center, and a gift shop will be included on the old bathhouse’s first floor. The second floor will include a classroom and computer lab and the third floor will house a meeting room and offices.
See Also: Notre Dame fire highlights danger of renovating historic structures
The completed park will host events such as black and white movie screenings, a farmers market, yoga, and art exhibitions.
Related Stories
| May 31, 2012
Product Solutions June 2012
Curing agents; commercial faucets; wall-cladding systems.
| May 31, 2012
2011 Reconstruction Awards Profile: Ka Makani Community Center
An abandoned historic structure gains a new life as the focal point of a legendary military district in Hawaii.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| May 11, 2012
2012 White Paper: High-Performance Reconstructed Buildings: The 99% Solution
Download the complete White Paper, Chapters 1-10
| May 11, 2012
Chapter 10 Action Plan: 18 Recommendations for Advancing Sustainability in Reconstructed Buildings
We offer the following recommendations in the hope that they will help step up the pace of high-performance building reconstruction in the U.S. and Canada. We consulted many experts for advice, but these recommendations are solely the responsibility of the editors of Building Design+Construction. We welcome your comments. Please send them to Robert Cassidy, Editorial Director: rcassidy@sgcmail.com.
| May 11, 2012
Chapter 9 The Key to Commissioning That Works? It Never Stops
Why commissioning for existing and renovated buildings needs to be continuous to be effective.