flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Chicago Cubs unveil plans for premier fan club underneath box seats at Wrigley Field

Sports and Recreational Facilities

Chicago Cubs unveil plans for premier fan club underneath box seats at Wrigley Field

As part of the baseball team’s larger stadium renovation project, the club will offer exclusive food, drinks, and seating.


By Mike Chamernik, Associate Editor | July 20, 2016
Chicago Cubs unveil plans for premier fan club underneath box seats at Wrigley Field

Rendering: Chicago Cubs.

The Chicago Cubs announced plans to build an exclusive club underneath the best seats in Wrigley Field.

The Chicago Tribune reports that fans with tickets will be able to access the American Airlines 1914 Club for upgraded food and beverages, comfortable indoor seating, and private bathrooms (but no views of the field, however).

Nearly 300 people have already reserved their spots on the club’s the priority list.

After the 2016 season ends, crews will tear up the seating sections behind home plate and in between the dugouts (the ballpark’s most expensive seats closest to the field). The shell of the club will be built below. To accommodate construction, the dugouts will be move further down the baselines, away from home plate.

The seating areas will be ready for the 2017 season, but construction on the club will continue throughout the year. It will open for the 2018 season.

The club is part of the larger 1060 Project, a project that began in 2014 that is transforming the century-old Wrigley into a ballpark with premium features, modern amenities, and a revenue-generating, fan-friendly surrounding mixed-use development. Earlier this year, the Cubs opened a new team clubhouse underneath an old parking lot on the west side of the park.

The American Airlines 1914 Club (named after its corporate advertiser and the year in which Wrigley opened) is the first of four "premier experiences" coming to the ballpark. Clubs will be built on the first base side, third base side, and in the upper level. Suites will also be renovated.

Related Stories

Sports and Recreational Facilities | May 1, 2020

DLR Group completes LA Memorial Coliseum Renovation

The work finished prior to the 2019 USC season.

Sports and Recreational Facilities | Apr 27, 2020

Erudite eSports: Colleges build their very own eSports arenas

Universities are building dedicated spaces for eSport athletes to pick up the sticks.

Sports and Recreational Facilities | Feb 27, 2020

Disney to develop private island destination in The Bahamas

This will be Disney’s second private island retreat.  

Sports and Recreational Facilities | Feb 6, 2020

Europe’s first LEGOLAND Water Park is set to open

The water park will be part of Italy’s Gardaland Theme Park in Gardaland, Italy.

GIANTS 19 PREMIUM | Dec 23, 2019

Top 65 Sports Facilities Engineering Firms for 2019

Walter P Moore, Kimley-Horn, ME Engineers, Thornton Tomasetti, and EXP head the rankings of the nation's largest sports facilities sector engineering and engineering/architecture (EA) firms, as reported in Building Design+Construction's 2019 Giants 300 Report.

GIANTS 19 PREMIUM | Dec 23, 2019

Top 90 Sports Facilities Architecture Firms for 2019

Populous, HKS, HOK, Gensler, and HNTB top the rankings of the nation's largest sports facilities sector architecture and architecture engineering (AE) firms, as reported in Building Design+Construction's 2019 Giants 300 Report.

Sports and Recreational Facilities | Dec 6, 2019

An architect in Florence proposes a new soccer stadium as part of a larger urban redevelopment

The owner of Fiorentina, the soccer team, wants to move into a new facility by 2023.

Sports and Recreational Facilities | Nov 22, 2019

HKS designs Team Vitality’s new Paris HQ

The facility is meant to draw in more than just eSports fans.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021