flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Chicago Cubs unveil plans for premier fan club underneath box seats at Wrigley Field

Sports and Recreational Facilities

Chicago Cubs unveil plans for premier fan club underneath box seats at Wrigley Field

As part of the baseball team’s larger stadium renovation project, the club will offer exclusive food, drinks, and seating.


By Mike Chamernik, Associate Editor | July 20, 2016
Chicago Cubs unveil plans for premier fan club underneath box seats at Wrigley Field

Rendering: Chicago Cubs.

The Chicago Cubs announced plans to build an exclusive club underneath the best seats in Wrigley Field.

The Chicago Tribune reports that fans with tickets will be able to access the American Airlines 1914 Club for upgraded food and beverages, comfortable indoor seating, and private bathrooms (but no views of the field, however).

Nearly 300 people have already reserved their spots on the club’s the priority list.

After the 2016 season ends, crews will tear up the seating sections behind home plate and in between the dugouts (the ballpark’s most expensive seats closest to the field). The shell of the club will be built below. To accommodate construction, the dugouts will be move further down the baselines, away from home plate.

The seating areas will be ready for the 2017 season, but construction on the club will continue throughout the year. It will open for the 2018 season.

The club is part of the larger 1060 Project, a project that began in 2014 that is transforming the century-old Wrigley into a ballpark with premium features, modern amenities, and a revenue-generating, fan-friendly surrounding mixed-use development. Earlier this year, the Cubs opened a new team clubhouse underneath an old parking lot on the west side of the park.

The American Airlines 1914 Club (named after its corporate advertiser and the year in which Wrigley opened) is the first of four "premier experiences" coming to the ballpark. Clubs will be built on the first base side, third base side, and in the upper level. Suites will also be renovated.

Related Stories

| May 24, 2018

Accelerate Live! talk: Security and the built environment: Insights from an embassy designer

In this 15-minute talk at BD+C’s Accelerate Live! conference (May 10, 2018, Chicago), embassy designer Tom Jacobs explores ways that provide the needed protection while keeping intact the representational and inspirational qualities of a design.

Building Team Awards | May 16, 2018

Game, set, match: United States Tennis Association National Campus

Gold Award: With 100 courts and more than 260,000 sf of vertical construction, the USTA National Campus is a sanctuary for tennis enthusiasts.

Sports and Recreational Facilities | May 15, 2018

Is this the most environmentally sustainable arena in the country?

The university arena was designed by Architectural Resources Cambridge.

Sports and Recreational Facilities | Apr 19, 2018

Watch a time-lapse of Wrigley Field’s most recent phase of renovations

The renovations took place between October 2017 and April 2018.

Sports and Recreational Facilities | Apr 3, 2018

Westminster College’s new athletic stadium includes a turf field and seating for 2,000

The project is the largest capital improvement project on the campus in over a decade.

Sports and Recreational Facilities | Mar 30, 2018

Final Four excitement? Here are two collegiate sports facilities to check out before your weekend of hoops

CannonDesign recently shared new images of two collegiate sports projects with interesting ties to college basketball past, present and future.

Sports and Recreational Facilities | Feb 23, 2018

A gym’s exercise equipment helps power an arts and sciences center in Rochester, N.Y.

The equipment’s supplier is eyeing the U.S. for aggressive growth.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021