flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Chicago’s first citizenM hotel to be part of Sterling Bay’s mixed-use Michigan Ave. development

Mixed-Use

Chicago’s first citizenM hotel to be part of Sterling Bay’s mixed-use Michigan Ave. development

bKL will serve as the project’s lead architect.


By David Malone, Associate Editor | November 26, 2019
citizenM Chicago ground floor retail

Courtesy citizenM

Chicago’s first citizenM hotel is set to rise as part of Sterling Bay’s mixed-use development at 300 North Michigan Avenue, located between the Riverwalk and Millenium Park. 

The 47-story, 523-foot tower will include 289 residential units, 280 hotel rooms, and 25,000 sf of retail space. The ground floor retail will open directly to the street with the hotel and a terrace above. A subterranean, 22-parking-spot garage will also be included. 

The 280 hotel rooms will feature XL king-sized beds, an HD TV with a library of on-demand movies and streaming options via free WiFi, a rain shower, and customizable room ambiance – the blinds, TV, and lights are all enabled to change colors – controlled by an iPad.

 

See Also: Over 400 micro units spread across two communities under development in Austin

 

The interior’s, designed by Amsterdam-based design firm Concrete, will be inspired by the local community and feature a mix of contemporary art, photography, and objects by local artists. Chicago’s bKL will serve as the lead architect. Once completed, a subsidiary of citizenM will acquire the hotel.

The citizenM Chicago project will join other citizenM projects currently under development in the U.S. in Miami, Los Angeles, San Francisco, Seattle, and Washington, D.C. Locations in Boston and New York have recently opened.

Tags

Related Stories

High-rise Construction | Nov 1, 2016

Winthrop Square will give rise to Boston’s second tallest building

The building will become the tallest residential tower in the city.

Mixed-Use | Oct 31, 2016

New Frank Gehry project on Sunset Boulevard moves forward with a few compromises

Among the compromises, the 8150 Sunset Blvd. project will see its tallest residential tower reduced by 56 feet.

Mixed-Use | Sep 27, 2016

10 Design wins competition to design huge mixed-use development in China

China Resources Land, New Fenghong Real Estate Development, and China Resources Trust have designated 50 billion yuan for the construction of the development.

High-rise Construction | Sep 12, 2016

Bangkok’s tallest tower is also one of its most unique

At 1,030 feet tall, MahaNakhon Tower’s height is only outdone by its arresting design.

Mixed-Use | Sep 9, 2016

Rolled book scroll-inspired mixed-use project from Aedas planned for Chongqing, China

With a bookstore at the heart of the development, the project looks to exemplify an ancient Chinese proverb that says “knowledge brings wealth.”

Mixed-Use | Sep 8, 2016

Former sports stadium to become landscaped gardens, housing, and shops

According to the architects, Maison Edouard François, the project will act as a new green lung for the densely populated neighborhood.

Mixed-Use | Aug 16, 2016

Goettsch Partners completes mixed-use tower in R&F Yingkai Square

The 66-story building is now the 7th tallest completed building in Guangzhou.

High-rise Construction | Jul 26, 2016

Perkins+Will unveils plans for what will be Atlanta’s second-tallest tower

The 74-story 98 Fourteenth Street will be a mixed-use building with retail space and luxury residential units.

Mixed-Use | Jul 18, 2016

Studio Libeskind designs jagged mixed-use tower for Lithuania’s capital

The glass facade, and spaces for restaurants, a luxury hotel, and offices will lure visitors and tenants.

Retail Centers | May 10, 2016

5 factors guiding restaurant design

Restaurants are more than just places to eat. They are comprising town centers and playing into the future of brick-and-mortar retail.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021