flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Chicago’s first indoor track and field facility features a hydraulically banked track

Sports and Recreational Facilities

Chicago’s first indoor track and field facility features a hydraulically banked track

It is the first hydraulically banked track in Illinois.


By David Malone, Managing Editor | July 7, 2021
Gately Park track
Gately Park track

A new $53.67 million Indoor Track & Field Facility at Gately Park has completed construction in Chicago’s Pullman neighborhood.

The 139,375-sf building features a 118,000-sf field house that includes a 200-meter, six-lane running track; high jump and long jump pits; pole vault, hurdle, and relay areas; throw cages; sprint lanes; concession areas; locker rooms; and seating for 3,500 spectators. 

The remaining 22,000 sf includes a fitness center, multipurpose rooms for community use, Chicago Park District administrative offices, and After School Matters programming space. The After School Matters area, which was designed by Eckenhoff Saunders Architects, includes a dance and exercise studio, a full culinary teaching kitchen, gathering/performance space, a rooftop deck and garden, and multipurpose labs for art, music, science, and technology. The flexible design allows the space to convert to multiple athletic purposes and can accommodate four basketball and six volleyball courts.

 

Gately Park Teaching Kitchen

 

The facility’s main feature is its oval track that can be banked to eliminate the centrifugal force that makes athletes lean one way or the other, allowing them to achieve their top speed. The track’s interior lane rests on a pivot and the support system underneath rests on hydraulic cylinders that are part of the actuator system that makes it possible to bank the track for a race. Depending on the length of the race, the track has as many as six preset banking angles. When not in use, all of the track’s lanes lay flat so the space can be used for additional recreation.

 

Gately Park Exterior

 

The building also features a column-free design as to not interfere with track and field events, which meant the fieldhouse roof was constructed with six massive, 252-foot-by-20-foot-deep barrel-vaulted, 120-ton roof trusses that span the entire width of the space.

In addition to Williams Architects, the build team also included McHugh Construction and Bowa Construction.

 

Gately Park banked track

Related Stories

Sports and Recreational Facilities | Jun 27, 2019

Foster + Partners unveils design of wooden boathouse for Row New York

The project will sit on the banks of the Harlem River in Sherman Creek Park.

Sports and Recreational Facilities | Jun 19, 2019

Have a Coke and a smile: New Coca-Cola Arena in Dubai is on cutting edge of arena design

It is being called the only venue of its kind between Istanbul and Singapore that can host events throughout the year.

Sports and Recreational Facilities | May 29, 2019

HOK and SAP explore the future of eSports

Flexibility and connectivity between the digital and physical space are key.

Sports and Recreational Facilities | May 24, 2019

Beverly Hills’ La Cienega Park to be redesigned by Johnson Favaro

The park will include new indoor and outdoor space.

Sports and Recreational Facilities | Apr 24, 2019

MLS stadium design unveiled for St. Louis

Plans capitalize on league’s plans to expand.

Sports and Recreational Facilities | Apr 12, 2019

New ballpark is another draw for thriving downtown in Summerlin, Nev.

Developer Howard Hughes views the stadium as an essential piece to this master-planned community’s growth.

Sports and Recreational Facilities | Apr 4, 2019

Texas Rangers’ Globe Life Field progresses toward its 2020 completion date

The stadium will be the cornerstone of the Texas Live! Development.

Sports and Recreational Facilities | Mar 20, 2019

HKS unveils retractable-roof ballpark in Japan

The Nippon-Ham Fighters Baseball Club will call the park home.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021