flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Chicago’s West Loop to receive 500-foot apartment tower

High-rise Construction

Chicago’s West Loop to receive 500-foot apartment tower

The 44-story tower will provide 492 rental units and a retail podium.


By David Malone, Associate Editor | January 31, 2017

Rendering courtesy of FitzGerald Associates Architects

Just over one week ago, a Chicago apartment tower project that was revealed in 2011 and approved by the city the following year finally received a construction permit.

According to Curbed Chicago, the cylindrical tower, dubbed One South Halsted, will rise 44-stories and 495 feet in the air and become the tallest building in Chicago west of the Kennedy Expressway.

One South Halsted will replace the Crowne Plaza’s surface lot in Greektown. A new 375-spot parking garage, scaled down from earlier plans that called for 520 spaces, will be shared between the building’s residents and guests of the Crowne Plaza. In addition to the parking spots that were eliminated, a ballroom connecting to the existing hotel via an elevated bridge has also been removed from the original proposal.

The entire building measures just under 800,000 sf. 9,500 sf of that space will be set aside for ground floor retail. A total of 30,710 sf is designated for office and retail combined. 492 rental apartments, and associated amenities, will occupy the rest of the space. The recently approved construction permit lists the project’s cost at $136 million and covers foundation and structural-only work through the seventh floor.

The project is being co-developed by Fifield Companies and F&F Realty. FitzGerald Associates Architects is the architect for the project while Lendlease will be the general contractor.

 

Rendering courtesy of FitzGerald Associates Architects.

Related Stories

| May 15, 2012

One World Trade Center goes to new height of sustainability

One of the biggest challenges in developing this concrete mixture was meeting the Port Authority of New York/New Jersey’s strict requirement for the replacement of cement.

| May 14, 2012

SOM to break ground on supertall structure in China

The 1,740-feet (530-meter) tall tower will house offices, 300 service apartments and a 350-room, 5-star hotel beneath an arched top.

| May 14, 2012

Adrian Smith + Gordon Gill Architecture design Seoul’s Dancing Dragons

Supertall two-tower complex located in Seoul’s Yongsan International Business District.

| May 1, 2012

Time-lapse video: World Trade Center, New York

One World Trade Center, being built at the site of the fallen twin towers, surpassed the Empire State Building on Monday as the tallest building in New York.

| Apr 27, 2012

China Mobile selects Leo A Daly to design three buildings at its new HQ

LEO A DALY, in collaboration with Local Design Institute WDCE, wins competition to design Phase 2, Plot B, of Campus.

| Apr 25, 2012

McCarthy introduces high school students to a career in construction

High school students from the ACE Mentoring Program tour the new CHOC Children’s Patient Tower in Orange, Calif.

| Apr 25, 2012

J.C. Anderson selected for 50,000-sf build out at Chicago’s DePaul University

The build-out will consist of the construction of new offices, meeting rooms, video rooms and a state-of-the-art multi-tiered Trading Room.

| Apr 24, 2012

ULI Real Estate Consensus Forecast, projects improvements for the real estate industry through 2014

Survey is based on opinions from 38 of the nation’s leading real estate economists and analysts and suggests a marked increase in commercial real estate activity, with total transaction volume expected to rise from $250 billion in 2012 to $312 billion in 2014.

| Apr 23, 2012

Innovative engineering behind BIG’s Vancouver Tower

Buro Happold’s structural design supports the top-heavy, complex building in a high seismic zone; engineers are using BIM technology to design a concrete structure with post-tensioned walls.

| Apr 10, 2012

Moriarty & Associates selected as GC for Miami’s BrickellHouse Condo

Construction of the 46-story development is schedule to get underway this summer and be completed in 2014.

boombox1
boombox2
native1

More In Category




Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021