Dana Point, Calif., is a coastal city in Orange County best known for its harbor. Lately, the city’s downtown area has become more appealing to visitors and residents alike, thanks in part to redevelopment that has created more live-work-play options. Prado West is one such project. This mixed-use development on 2.3 acres consists of three buildings that encompass 32,500 sf of retail and restaurant space, 109 apartments with 50 floor plans, and a 24-hour fitness center.
The developer, Raintree Partners, had owned this site for a while, and was on board with the city’s vision to regenerate its downtown area, says Michael Heinrich, a Principal with AO, the architectural design firm that was the design architect and AOR on this project.
Raintree, he adds, “was not the typical multifamily client we usually work with. But it always intended for the project to be mixed use.”
Smoothing a hilly site
Prior to Prado West’s emergence, this site was an assemblage of buildings and parking spaces that included a post office and distribution center (both of which Raintree tried, unsuccessfully, to acquire). The site’s “urban character” was “pretty sparse,” recalls Heinrich, with its collection of sheds for street merchants.
The triangular site was sloped, and required a considerable amount of grading to make Prado West work, especially for the retail stores and restaurants. Heinrich notes, too, that the project required subterranean parking under a street called Amber Lantern that needed to be rebuilt.
(The building team on Prado West included W.E. O’Neil Construction (GC), Psomas (CE), Hendy (interior design), Nova Services (geotechnical engineer), and GMP Land Architecture (landscape architect)).
Scaled to its surroundings
The 3- and 4-story-tall buildings at Prado West had to stay within a prescribed 40-ft height limit, and the building team conducted a story pole analysis using cranes to make sure the buildings wouldn’t block residents’ seaside views.
AO, says Heinrich, does a lot of shopping mall renovations the incorporate residential to create a sense of place, like a village. At Prado West, the plaza is open to the city and is available for community events. I’m all for this,” says Heinrich about this kind of access, noting that the plaza is well lighted so there’s less concern about security.
This project followed form-based zoning, and AO did a unit plan that was almost like condos: the apartment sizes go up to 1,200 sf, with 100 ft of patio.
Heinrich says that among the takeaways from Prado West were “we learned about putting retail on a hilly site. And because this is a coastal town, the design had to be sensitive to appearance,” meaning that the buildings were scaled to seem smaller than their actual mass.
At the same time Prado West was under construction, the city was renovating the mile-long stretch of the Pacific Coast Highway that runs through downtown, widening the road to two lanes both ways, adding new curbing and planting new palm trees.
“It’s beautiful,” says Heinrich, “and I can see Dana Point finally fulfilling its vision.
Related Stories
| Jan 15, 2012
Smith Consulting Architects designs Flower Hill Promenade expansion in Del Mar, Calif.
The $22 million expansion includes a 75,000-square-foot, two-story retail/office building and a 397-car parking structure, along with parking and circulation improvements and new landscaping throughout.
| Dec 27, 2011
Ground broken for adaptive reuse project
Located on the Garden State Parkway, the master-planned project initially includes the conversion of a 114-year-old, 365,000-square-foot, six-story warehouse building into 361 loft-style apartments, and the creation of a three-level parking facility.
| Dec 19, 2011
Chicago’s Aqua Tower wins international design award
Aqua was named both regional and international winner of the International Property Award as Best Residential High-Rise Development.
| Dec 12, 2011
Mojo Stumer takes top honors at AIA Long Island Design Awards
Firm's TriBeCa Loft wins "Archi" for interior design.
| Dec 5, 2011
Summit Design+Build begins renovation of Chicago’s Esquire Theatre
The 33,000 square foot building will undergo an extensive structural remodel and core & shell build-out changing the building’s use from a movie theater to a high-end retail center.
| Nov 28, 2011
Leo A Daly and McCarthy Building complete Casino Del Sol expansion in Tucson, Ariz.
Firms partner with Pascua Yaqui Tribe to bring new $130 million Hotel, Spa & Convention Center to the Tucson, Ariz., community.
| Nov 15, 2011
Suffolk Construction breaks ground on the Victor housing development in Boston
Project team to manage construction of $92 million, 377,000 square-foot residential tower.
| Nov 3, 2011
Hardin Construction tops out Orlando Embassy Suites
The project began in April 2011 and is expected to open in fall 2012.
| Sep 30, 2011
Kilbourn joins Perkins Eastman
Kilbourn joins with more than 28 years of design and planning experience for communities, buildings, and interiors in hospitality, retail/mixed-use, corporate office, and healthcare.