flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The College of the Holy Cross completes a $110 million performing arts center

The College of the Holy Cross completes a $110 million performing arts center

Near Boston, the 84,000-square-foot facility includes a 400-seat concert hall and proscenium theater and a 200-seat flexible space.


By Novid Parsi, Contributing Editor | October 3, 2022
Prior Performing Arts Center ext
Courtesy DILLER SCOFIDIO + RENFRO.

In Worcester, Mass., a one-hour drive from Boston, the College of the Holy Cross has completed its $110 million Prior Performing Arts Center. Designed by Diller Scofidio + Renfro (DS+R), the 84,000-square-foot facility serves as an incubator for multidisciplinary learning and creativity, with venues for both fine arts and performing arts. The PAC will support creative collaboration among faculty and students across all academic disciplines.

Among the PAC’s key features, the Beehive is a flexible space that includes a shared multimedia teaching area for electronic music and musical composition courses, sound recording, sound editing, and video and film editing. The Beehive also provides collaborative workspaces, multipurpose rehearsal spaces, a cafe, and gathering spaces with movable furniture.

The Luth Concert Hall, a 400-seat convertible concert hall and proscenium theater, serves as the College’s principal venue for symphonic music, chamber music, jazz, gamelan, and opera, as well as musical theater and dance. The Boroughs Theatre is a 200-seat, fully flexible experimental theater space. And the Cantor Art Gallery offers a variety of interdisciplinary exhibits and increased exhibition and storage space.

Support spaces include a scene shop, costume design studio, recording studio, lighting and set design study, and multi-use spaces to encourage collaboration among the arts and between the arts and other disciplines. Outdoor amenities include a small amphitheater, an outdoor teaching area and workspace, a meditative garden, and a sculpture garden. 

Major inaugural performances at the PAC will take place in December, including the world premiere of a new violin concerto composed by a College of the Holy Cross professor.

On the Building Team:
Owner: College of the Holy Cross
Executive architect: Perry Dean Rogers
Landscape architect: OLIN
Civil engineer: Nitsch Engineering
MEP engineer: Altieri Sebor Wieber
Structural engineer: Robert Silman Associates

Prior PAC ext 2
Courtesy Iwan Baan.
Prior PAC int
Courtesy Iwan Baan.
Prior PAC theater
Courtesy Iwan Baan.
Prior PAC int 3
Courtesy Iwan Baan.
Prior PAC int 4
Courtesy Iwan Baan.
Prior PAC int 5
Courtesy Brett Beyer.
PAC Prior int 6
Courtesy Brett Beyer.
Prior PAC theater int 7
Courtesy Brett Beyer.

 

Related Stories

Cultural Facilities | Sep 11, 2019

The Kennedy Center expands for the first time since its 1971 debut

The REACH, with three pavilions on a generous lawn, adds openness and light to this performance space.

Performing Arts Centers | Jan 31, 2019

The Glorya Kaufman Performing Arts Center begins construction

AUX Architecture designed the building.

Performing Arts Centers | Mar 23, 2018

Frank Gehry selected to design Colburn School Expansion

The expansion will add three performance venues to the downtown L.A. campus.

Performing Arts Centers | Mar 15, 2018

BIG designs bow tie-shaped building for the National Theatre of Albania

The project is a 3-in-1 cultural venue in downtown Tirana.

Performing Arts Centers | Sep 11, 2017

19th century smokestack highlights a Massachusetts performing arts facility

CBT Architects and Windover Construction collaborated on the adaptive reuse project for Middlesex School.

Performing Arts Centers | Jun 30, 2017

L.A.’s John Anson Ford Amphitheater might finally be ready for its close-up

The performing arts venue, nearly a century old, has undergone an extensive refurbishing.

Performing Arts Centers | May 8, 2017

The performing arts center of the future

For more than 15 years, LPA has completed many projects for the East Central Independent School District (ECISD), and the Performing Arts Center is just one example of how a research-based, collaborative process can improve outcomes.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021