flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Frank Gehry selected to design Colburn School Expansion

Performing Arts Centers

Frank Gehry selected to design Colburn School Expansion

The expansion will add three performance venues to the downtown L.A. campus.


By David Malone, Associate Editor | March 23, 2018

Courtesy of the Colburn School

The Colburn School has selected Frank Gehry to join the all-L.A. team for the campus’s downtown Los Angeles expansion.

The project will add three performance venues, an outdoor performance area, classrooms, a dance rehearsal center, and student and guest artist housing. The largest of the new venues will be the 1,100-seat concert hall, the Colburn School’s first venue for full-scale orchestra performances.

A 700-seat flexible studio theater for dance and vocal performance and a 100-seat cabaret-style space are also included. The 700-seat Studio Theater is envisioned as a hybrid courtyard-style theater that will accommodate multiple seating configurations and can serve as a special events space with banquet seating for up to 500. The cabaret-style club space will be used for small-ensemble performances of amplified and non-amplified music.

 

Courtesy of the Colburn School.

 

The new expansion will be constructed on a parcel of land between South Olive and Hill Streets and comprise approximately 200,000 sf. The Colburn School Expansion will mark the third building in the immediate area designed by Gehry. The others include the Walt Disney Concert Hall and a mixed-use project he is designing for the Related Companies.

Yosuhisa Toyota of Nagata Acoustics and Michael Ferguson, Principal of TheatreDNA will collaborate with Gehry on the project.

Related Stories

Performing Arts Centers | Oct 21, 2024

The New Jersey Performing Arts Center breaks ground on $336 million redevelopment of its 12-acre campus

In Newark, N.J., the New Jersey Performing Arts Center (NJPAC) has broken grown on the three-year, $336 million redevelopment of its 12-acre campus. The project will provide downtown Newark 350 mixed-income residential units, along with shops, restaurants, outdoor gathering spaces, and an education and community center with professional rehearsal spaces.

Performing Arts Centers | Oct 16, 2024

A famed performing arts center gets its first facelift in 25 years

When it’s completed in 2025, the Delacorte Theater in New York will be more accessible and operationally efficient.

Performing Arts Centers | Oct 10, 2024

Studio Gang's performing arts center for Hudson Valley Shakespeare breaks ground

A new permanent home for Hudson Valley Shakespeare, a professional non-profit theater company, recently broke ground in Garrison, N.Y. The Samuel H. Scripps Theater Center includes a 14,850 sf performance venue that will serve as a permanent home for the theater company known for its sweeping open-air productions of classics and new works.

Adaptive Reuse | Apr 5, 2024

McHugh Construction completes restoration of Chicago’s historic Ramova Theatre

Adaptive reuse project turns 1929 cinema into a live performance venue, adds a brewery and a taproom, and revives the Ramova Grill in Chicago’s Bridgeport neighborhood.

Cultural Facilities | Mar 26, 2024

Renovation restores century-old Brooklyn Paramount Theater to its original use

The renovation of the iconic Brooklyn Paramount Theater restored the building to its original purpose as a movie theater and music performance venue. Long Island University had acquired the venue in the 1960s and repurposed it as the school’s basketball court.

Performing Arts Centers | Feb 27, 2024

Frank Gehry-designed expansion of the Colburn School performing arts center set to break ground

In April, the Colburn School, an institute for music and dance education and performance, will break ground on a 100,000-sf expansion designed by architect Frank Gehry. Located in downtown Los Angeles, the performing arts center will join the neighboring Walt Disney Concert Hall and The Grand by Gehry, forming the largest concentration of Gehry-designed buildings in the world.

Giants 400 | Feb 8, 2024

Top 35 Performing Arts Center and Concert Venue Construction Firms for 2023

The Whiting-Turner Contracting Company, Holder Construction, McCarthy Holdings, Clark Group, and Gilbane Building Company top BD+C's ranking of the nation's largest performing arts center and concert venue general contractors and construction management (CM) firms for 2023, as reported in Building Design+Construction's 2023 Giants 400 Report.

Giants 400 | Feb 8, 2024

Top 40 Performing Arts Center and Concert Venue Engineering Firms for 2023

KPFF Consulting Engineers, Morrison Hershfield, ME Engineers, Thornton Tomasetti, and Arup top BD+C's ranking of the nation's largest performing arts center and concert venue engineering and engineering/architecture (EA) firms for 2023, as reported in Building Design+Construction's 2023 Giants 400 Report.

Giants 400 | Feb 8, 2024

Top 60 Performing Arts Center and Concert Venue Architecture Firms for 2023

Populous, DLR Group, Gensler, HGA, and Perkins Eastman top BD+C's ranking of the nation's largest performing arts center and concert venue architecture and architecture/engineering (AE) firms for 2023, as reported in Building Design+Construction's 2023 Giants 400 Report.  

Sponsored | BD+C University Course | Jan 17, 2024

Waterproofing deep foundations for new construction

This continuing education course, by Walter P Moore's Amos Chan, P.E., BECxP, CxA+BE, covers design considerations for below-grade waterproofing for new construction, the types of below-grade systems available, and specific concerns associated with waterproofing deep foundations.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021