Comcast Corporation announced last week its plan to build a second skyscraper in Philadelphia, adjacent to its current global headquarters, the 58-story, 973-foot Comcast Center.
The new building, designed by Norman Foster's Foster + Partners, will surpass the Comcast HQ by nearly 148 feet and will stand as the nation's tallest building outside of New York and Chicago, as well as one of the world's 40 tallest skyscrapers.
The joint development with Liberty Property Trust will house a 200-room Four Seasons hotel, a media center for local broadcast television stations, and office space.
Here is the Comcast press release on the project:
Comcast Corporation and Liberty Property Trust announced that they will jointly develop the Comcast Innovation and Technology Center on the 1800 block of Arch Street in Center City Philadelphia.
The proposed $1.2 billion 59-story, 1,121-foot tower will neighbor Comcast Center, Comcast Corporation’s global headquarters, and become a dedicated home for the company’s growing workforce of technologists, engineers, and software architects.
The facility will also create a media center in the heart of the City by becoming home to the operations of local broadcast television stations NBC 10/WCAU and Telemundo 62/WWSI and offer space for local technology startups.
Designed by world-renowned architect Lord Norman Foster of Foster + Partners, the glass and stainless steel tower will complement Comcast Center as a new energetic dimension to Center City.
The 1.517 million rentable square foot project will include a new Four Seasons hotel and a soaring, block-long lobby with a glass-enclosed indoor plaza accompaniment to Comcast Center’s existing, dynamic outdoor plaza. The lobby will feature a restaurant and a new concourse will provide direct connections with SEPTA’s Suburban Station, enhancing accessibility and providing new options for commuters.
The $1.2 billion mixed-use tower is expected to be the tallest building in the United States outside of New York and Chicago and will be the largest private development project in the history of Pennsylvania.
"This is yet another historic moment for Comcast," said Brian L. Roberts, Chairman and CEO, Comcast Corporation. "We continue to be proud to call Philadelphia our home, and are thrilled to build a world-class media, technology and innovation center right in the heart of the City, to bring NBC 10 and Telemundo 62 downtown, and to create thousands of jobs and further drive economic activity in the region. We have assembled an incredible design and development team to expand our vertical campus, and I am more excited than ever about the future of Comcast in Philadelphia."
Liberty Property Trust Chairman and CEO William P. Hankowsky said, "Liberty is thrilled to again have the opportunity to develop a transformative project for the city of Philadelphia, a project that will significantly contribute to the continuing renaissance of Center City as a forward-looking yet uniquely livable urban environment."
Lord Norman Foster commented, "This is a very special project. It is an opportunity to create a unique and sustainable model for mixed-use, high density development, which uniquely combines spaces for high tech research and development with restaurants, gardens, fitness facilities and a significant public reception space – a window on Philadelphia. At ground level this ‘urban room’ embraces the city; it opens the building to the public and anchors it as a vital new neighborhood. It also links directly into the below ground public transport system. Above this, the highly flexible loft-like spaces and studios are designed for a dynamic way of working – an engine for the city’s evolution as the kind of leading technology hub presently associated with Silicon Valley. We look forward to continuing our collaboration with Comcast and Liberty Property Trust to further develop an outstanding location and a new landmark on the Philadelphia skyline."
In addition to office space, the Comcast Innovation and Technology Center will house a Four Seasons hotel, featuring more than 200 rooms. The luxury hotel will include world-class spa, fitness, event and meeting facilities as well as an exciting new restaurant located on the top floor of the building, offering spectacular 360 degree city views.
"Four Seasons has called Philadelphia home for more than 30 years," said Scott Woroch, Executive Vice President Worldwide Development, Four Seasons Hotels and Resorts. "During this time we have set the standard for luxury hospitality in the city and become an integral part of the community. Today, Philadelphia is experiencing renewed growth and popularity. We are proud to be a part of one of the largest, most exciting new developments in the region and reaffirm our long-standing commitment to this great city."
Four Seasons will continue to manage its existing hotel at 1 Logan Square and assist the owner with the transition to a new brand prior to the expected opening of the new hotel in 2017.
Read the full release at: http://corporate.comcast.com/news-information/news-feed/comcast-innovation-technology-center-press-release
Related Stories
Cultural Facilities | Mar 26, 2024
Renovation restores century-old Brooklyn Paramount Theater to its original use
The renovation of the iconic Brooklyn Paramount Theater restored the building to its original purpose as a movie theater and music performance venue. Long Island University had acquired the venue in the 1960s and repurposed it as the school’s basketball court.
Adaptive Reuse | Mar 26, 2024
Adaptive Reuse Scorecard released to help developers assess project viability
Lamar Johnson Collaborative announced the debut of the firm’s Adaptive Reuse Scorecard, a proprietary methodology to quickly analyze the viability of converting buildings to other uses.
Security and Life Safety | Mar 26, 2024
Safeguarding our schools: Strategies to protect students and keep campuses safe
HMC Architects' PreK-12 Principal in Charge, Sherry Sajadpour, shares insights from school security experts and advisors on PreK-12 design strategies.
Green | Mar 25, 2024
Zero-carbon multifamily development designed for transactive energy
Living EmPower House, which is set to be the first zero-carbon, replicable, and equitable multifamily development designed for transactive energy, recently was awarded a $9 million Next EPIC Grant Construction Loan from the State of California.
Museums | Mar 25, 2024
Chrysler Museum of Art’s newly expanded Perry Glass Studio will display the art of glassmaking
In Norfolk, Va., the Chrysler Museum of Art’s Perry Glass Studio, an educational facility for glassmaking, will open a new addition in May. That will be followed by a renovation of the existing building scheduled for completion in December.
Sustainability | Mar 21, 2024
World’s first TRUE-certified building project completed in California
GENESIS Marina, an expansive laboratory and office campus in Brisbane, Calif., is the world’s first Total Resource Use and Efficiency (TRUE)-certified construction endeavor. The certification recognizes projects that achieve outstanding levels of resource efficiency through waste reduction, reuse, and recycling practices.
Office Buildings | Mar 21, 2024
Corporate carbon reduction pledges will have big impact on office market
Corporate carbon reduction commitments will have a significant impact on office leasing over the next few years. Businesses that have pledged to reduce their organization’s impact on climate change must ensure their next lease allows them to show material progress on their goals, according to a report by JLL.
Adaptive Reuse | Mar 21, 2024
Massachusetts launches program to spur office-to-residential conversions statewide
Massachusetts Gov. Maura Healey recently launched a program to help cities across the state identify underused office buildings that are best suited for residential conversions.
Legislation | Mar 21, 2024
Bill would mandate solar panels on public buildings in New York City
A recently introduced bill in the New York City Council would mandate solar panel installations on the roofs of all city-owned buildings. The legislation would require 100 MW of solar photovoltaic systems be installed on public buildings by the end of 2025.