The last recession isn’t over yet, at least as far as the glass products are concerned.
Glass manufacturers, which shut 11 of 47 float-glass North American plants between 2007 and 2014, are now playing catch-up with demand from commercial builders whose business is robust. The Wall Street Journal reports that glass prices have risen by more than 30% over the past 18 months. Construction projects are being delayed because they can’t get the glass they need, especially for curtain wall, the metal-framed glass panels that have become popular design components for skyscrapers, airport terminals, hotels, and many other nonresidential buildings.
“The glass guys are dictating the timetables of a project to us,” Ralph Esposito, who oversees Lend Lease’s commercial construction in New York, tells the Journal. AvalonBay Communities have seen glass prices rise by 35% to 45% from 2013, and expects this supply-and-demand dilemma to persist through early 2016, says Scott Kinter, its Senior Vice President in Boston.
The Producer Price Index for the broad category “flat glass” in July 2015 stood at 126.6, up 5% from July 2014. The Bureau of Labor Statistics does not adjust this category for seasonality.
Shortages have become so severe that The Related Cos., one of the country’s biggest developers, recently joined forces with M. Cohen & Sons, a specialty metal manufacturer, to open its own glass factory, called New Hudson Façades, in Linwood, Pa. The Journal quotes Bruce Beal, Related’s president, as stating that his firm needs more than 3,000 glass panels for one skyscraper it’s building on Manhattan’s West Side alone.
Demand and price increases for glass aren’t confined to North America, either. Saint-Gobain, one of the world’s leading glass producers, reported a 9.8% increase in flat glass sales, to 2.633 billion Euros (US$2.9 billion), for the first half of 2015, during which the company’s operating income for that category rose 48.1% to 194 million Euros.
Perhaps ironically, last April the Journal also reported how several cities across the country were pulling back on their glass-recycling programs because glass had become too difficult and expensive to handle.
Related Stories
| Mar 1, 2012
AIA: A clear difference, new developments in load-bearing glass
Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.
| Feb 29, 2012
Report says BIPV glass market to reach $6.4 billion by 2016
The report analyzes the opportunities for BIPV glass products using c-Si, thin-film and OPV/DSC materials and provides eight-year forecasts in terms of MW and square footage shipped as well as forecasts of revenue generated.
| Feb 16, 2012
Summit Design + Build begins build-out for Emmi Solutions in Chicago
The new headquarters will total 20,455 sq. ft. and feature a loft-style space with exposed masonry and mechanical systems, 15 foot clear ceilings, two large rooftop skylights and private offices with full glass partition walls.
| Feb 2, 2012
Fire rated glazing helps historic university preserve its past
When the University embarked on its first major addition since the opening of Hutchins Hall in 1933, preserving the Collegiate Gothic-style architecture was of utmost importance.
| Dec 20, 2011
Aragon Construction leading build-out of foursquare office
The modern, minimalist build-out will have elements of the foursquare “badges” in different aspects of the space, using glass, steel, and vibrantly painted gypsum board.
| Dec 10, 2011
10 Great Solutions
The editors of Building Design+Construction present 10 “Great Solutions” that highlight innovative technology and products that can be used to address some of the many problems Building Teams face in their day-to-day work. Readers are encouraged to submit entries for Great Solutions; if we use yours, you’ll receive a $25 gift certificate. Look for more Great Solutions in 2012 at: www.bdcnetwork.com/greatsolutions/2012.
| Dec 10, 2011
Turning Balconies Outside In
Operable glass balcony glazing systems provide solution to increase usable space in residential and commercial structures.
| Dec 5, 2011
Summit Design+Build begins renovation of Chicago’s Esquire Theatre
The 33,000 square foot building will undergo an extensive structural remodel and core & shell build-out changing the building’s use from a movie theater to a high-end retail center.
| Dec 5, 2011
Fraser Brown MacKenna wins Green Gown Award
Working closely with staff at Queen Mary University of London, MEP Engineers Mott MacDonald, Cost Consultants Burnley Wilson Fish and main contractor Charter Construction, we developed a three-fold solution for the sustainable retrofit of the building.