flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Construction activity will slow next year: JLL

Market Data

Construction activity will slow next year: JLL

Risk, labor, and technology are impacting what gets built.


By John Caulfield, Senior Editor | November 22, 2016

The rate at which the industry is adding construction workers isn't keeping pace with its demand, according to JLL's latest industry outlook. Image: JLL Q3 2016 Construction Outlook

This month, the national average hourly construction wage was expected to top $30 for the first time in the country’s history. And in its Q3 2016 Construction Outlook, JLL forecasts another 3% increase by next March.

That prediction comes at a time when the number of construction workers at the end of the third quarter of 2016—1.46 million—was up 2.8% compared to the same period a year earlier. “The size of the labor pool is rebounding from the downturn, but at a much slower rate than demand,” JLL reports. Consequently, poaching labor from competing contractors and bid jumping have increased in several markets.

Labor-intensive industries, such as drywall and roofing, can expect to experience continued cost growth as a result of manpower shortages.

What’s happening on the labor scene is one of three factors that JLL identifies as having the greatest impact on U.S. construction currently.

In the third quarter, $317 billion was spent on construction, up 1% from the same quarter in 2015. The national construction backlog was 8.5 months, flat from a year ago. And while the pipeline in many sectors remains strong across property types, JLL cautions that demand is “normalizing” in many markets. “We can expect to see a national slowdown in the construction industry by end-of-year 2017 and with it, a shift in how clients are using construction services.”

Increases in labor and materials are driving construction costs, especially in coastal metros where activity is particularly robust. Image: JLL Q3 2016 Construction Outlook.

 

Already, banks have become more selective in their lending practices, financing standards continue to tighten, and securing loans for construction is tougher. JLL also expects uncertainty over the next several months pending policy decisions of the new president, Donald Trump, who has stated publicly that investment in infrastructure will be a key focus.

JLL, though, isn’t so sure:

“By end-of-year 2017, expect to see a softer construction industry across the U.S., as demand and market saturations begin to level out across property types. A significant decline isn’t expected, but the rate of growth in the industry will slow, spurring greater competition between firms seeking work.”

Material costs rose 2.2% in the quarter, compared to 2015, as lumber consumption in the U.S. rose 10%. JLL doesn't expect the lumber trend to reverse until 2018 and 2019. Whereas, steel prices, which remain low, will continue to decline through the year few years, while cement prices, which have been declining slightly this year, will level off in 2017. 

The Construction Outlook finds that early adopters of technology are better positioned competitively for what could be coming next. Technology that includes BIM, drones, and 3D scanners “is having a profound impact on how project managers, contractors and service firms do their jobs through software, hardware, and the sharing economy.”

 

The Midwest region maintains an upward trajectory,but trails the West by two months. Southern construction markets are steadily growing and will continue to grow over the next three quarters. Image: JLL Q3 2016 Construction Outlook

 

The Outlook examined building activity in a number of sectors:

•At the end of the third quarter, 105.4 million sf of office space was under construction, up from 100.6 million sf in the same quarter a year ago. However, starts and completions were down.

•The pipeline for industrial construction rose 5.8% to 204.3 million sf, and quarterly absorptions jumped 32.3% over the second quarter.

•Acquisitions continue to drive growth in the hospitality sector, as transaction volume in the third quarter, $10.5 billion, was nearly double Q2 2016. However, while lodging occupancy still hovers at historic highs, it was down slightly in the third quarter, to 66.9%.

•82.4 million sf of retail space was under construction in the third quarter, more than 45% of which in the Southeast. But the retail sector remains volatile, after several recent announcements of store closings by high-profile chains like Office Depot/Office Max, which shuttered 400 outlets).

Related Stories

Market Data | Oct 16, 2020

5 must reads for the AEC industry today: October 16, 2020

Princeton's new museum and Miami's yacht-inspired luxury condos.

Market Data | Oct 15, 2020

6 must reads for the AEC industry today: October 15, 2020

Chicago's Bank of America Tower opens and altering facilities for a post-COVID-19 world.

Market Data | Oct 14, 2020

6 must reads for the AEC industry today: October 14, 2020

Thailand's new Elephant Museum and the Art Gallery of New South Wales receives an expansion.

Market Data | Oct 13, 2020

5 must reads for the AEC industry today: October 13, 2020

Miami Beach Convention Center renovation completes and guidance offered for K-12 schools to support students with asthma.

Market Data | Oct 12, 2020

Majority of contractors fear long-term business implications of COVID-19, according to Construction Executive survey

While many contractors have not yet seen drastic impacts to their business, as construction was in many areas considered an “essential” service, the long-term implications are concerning.

Market Data | Oct 12, 2020

6 must reads for the AEC industry today: October 12, 2020

4 challenges of realizing BIM's value for an owner and Florida office property is designed for a post-Covid world.

Market Data | Oct 8, 2020

6 must reads for the AEC industry today: October 8, 2020

The first rendering of the National Medal of Honor Museum is unveiled and seven urgent changes needed to fix senior living.

Market Data | Oct 7, 2020

6 must reads for the AEC industry today: October 7, 2020

Water-filled windows' effect on energy and construction begins on PGA of America HQ.

Market Data | Oct 6, 2020

Construction sector adds 26,000 workers in September but nonresidential jobs stall

Many commercial firms experience project cancellations.

Market Data | Oct 6, 2020

6 must reads for the AEC industry today: October 6, 2020

Construction rises 1.4% in August while nonresidential construction spending falls slightly.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021