The opening of SunTrust Park, the Atlanta Braves’ new $622 million, 41,500-seat stadium, is only 35 days away from opening day of the Major League Baseball season.
The stadium, designed by Populous and being built by American Builders, had its official groundbreaking on September 16, 2014. Since May 2015, OxBlue Corp., a construction camera provider, has been documenting the construction of the stadium and its plaza, known as The Battery Atlanta, using one fixed-position and two pan-tilt-zoom cameras that were mounted outside and above the stadium. Three other cameras were mounted at different locations on the 15-acre jobsite.
OxBlue has released a 1 minute-6 second video that compresses 21 months of construction. It was produced using a selection of 203,616 images captured by the three cameras.
SunTrust Park will include the first full LED lighting system in a major league stadium, and a canopy that shades about 60% of its seats from the sun.
Click here as well to take a 360-degree tour of the stadium. (You can move the image to see different parts of the park.)
Related Stories
| Sep 30, 2011
Design your own floor program
Program allows users to choose from a variety of flooring and line accent colors to create unique floor designs to complement any athletic facility.
| Sep 16, 2011
Largest solar installation completed at Redskins' football stadium
On game days, solar power can provide up to 20% of FedExField’s power.
| Sep 12, 2011
First phase of plan to revitalize Florida's Hialeah Park announced
This is the first project of a master plan developed to revive the historic racetrack.
| May 25, 2011
Olympic site spurs green building movement in UK
London's environmentally friendly 2012 Olympic venues are fuelling a green building movement in Britain.
| Apr 11, 2011
Wind turbines to generate power for new UNT football stadium
The University of North Texas has received a $2 million grant from the State Energy Conservation Office to install three wind turbines that will feed the electrical grid and provide power to UNT’s new football stadium.
| Apr 5, 2011
U.S. sports industry leads charge in meeting environmental challenges
The U.S. sports industry generates $414 billion annually. The amount of energy being consumed is not often thought of by fans when heading to the stadium or ballpark, but these stadiums, parks, and arenas use massive quantities of energy. Now sports leagues in North America are making a play to curb the waste and score environmental gains.
| Mar 25, 2011
Qatar World Cup may feature carbon-fiber ‘clouds’
Engineers at Qatar University’s Department of Mechanical and Industrial Engineering are busy developing what they believe could act as artificial “clouds,” man-made saucer-type structures suspended over a given soccer stadium, working to shield tens of thousands of spectators from suffocating summer temperatures that regularly top 115 degrees Fahrenheit.
| Mar 11, 2011
University of Oregon scores with new $227 million basketball arena
The University of Oregon’s Matthew Knight Arena opened January 13 with a men’s basketball game against USC where the Ducks beat the Trojans, 68-62. The $227 million arena, which replaces the school’s 84-year-old McArthur Court, has a seating bowl pitched at 36 degrees to replicate the close-to-the-action feel of the smaller arena it replaced, although this new one accommodates 12,364 fans.