flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Construction begins on 47-story luxury tower in Chicago’s South Loop

High-rise Construction

Construction begins on 47-story luxury tower in Chicago’s South Loop

The glass tower is being built at 1326 S. Michigan Avenue.


By David Malone, Associate Editor | May 15, 2017

Rendering courtesy Solomon Cordwell Buenz 

The new 47-story luxury residential high-rise designed for Chicago’s South Loop has officially broken ground.

Designed by Solomon Cordwell Buenz and built by Walsh Construction, the new tower will comprise 500 luxury rental units and 188 parking spots. In addition to the residential aspect, the tower will also have 7,500 sf of retail space.

Amenities for the glass high-rise include a library, lounge, dog park, spa, and a rooftop pool. Co-working space and green spaces will also be included. Chicago-based Murphy Development group and Los Angeles-based CIM Group are developing the project.

The building, which is scheduled for a 2019 opening, will be constructed to LEED Certified standards.

Walsh Construction has already completed a 40-story tower in the city’s South Loop and is currently working on another 33-story apartment building.

 

Related Stories

High-rise Construction | May 23, 2017

Goettsch Partners to design three-building Optics Valley Center complex

The Chicago-based firm won a design competition to design the complex located in Wuhan, China.

High-rise Construction | Apr 26, 2017

Dubai’s newest building is a giant gilded picture frame

Despite currently being under construction, the building is the center of an ongoing lawsuit filed by the architect.

3D Printing | Apr 17, 2017

The Tokyo Pod Vending Machine resembles a giant game of Tetris in the sky

The building is designed to print and dispense its own dwellings in vending machine-obsessed Tokyo.

Green | Apr 11, 2017

Passivhaus for high-rises? Research demonstrates viability of the stringent standards for tall residential buildings

A new study conducted by FXFOWLE shows that Building Teams can meet stringent Passivhaus performance standards with minimal impact to first cost and aesthetics.

Mixed-Use | Apr 5, 2017

SOM-designed ‘vertical village’ is Thailand’s largest private-sector development ever

60,000 people will live and work in One Bangkok when it is completed in 2025.

High-rise Construction | Apr 4, 2017

Fifth tallest tower in the world opens in Seoul with the world’s highest glass-bottomed observation deck

Lotte World Tower’s glass-bottomed observation deck allows visitors to stand 1,640 feet above ground and look straight down.

High-rise Construction | Mar 31, 2017

Ping An Finance Center officially becomes the fourth tallest building in the world

The completed building sits between the Makkah Royal Clock Tower at 1,972 feet and One World Trade Center at 1,776 feet.

High-rise Construction | Mar 27, 2017

Density and tall buildings

CRTKL’s Maren Striker examines Europe’s desire to build upward.

High-rise Construction | Mar 23, 2017

This speculative skyscraper would be suspended from an orbiting asteroid

Clouds Architecture, a New York-based architecture firm, has created a design to invert a skyscraper’s traditional earth-based foundation and replace it with a space-based supporting foundation from which the tower is suspended.

High-rise Construction | Mar 22, 2017

Porsche Design Tower is, unsurprisingly, a car lover’s dream

The idea behind the residential tower was to provide residents with a full single family home in the sky, complete with a private garage and pool.

boombox1
boombox2
native1

More In Category




Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021