flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Construction begins on 47-story luxury tower in Chicago’s South Loop

High-rise Construction

Construction begins on 47-story luxury tower in Chicago’s South Loop

The glass tower is being built at 1326 S. Michigan Avenue.


By David Malone, Associate Editor | May 15, 2017

Rendering courtesy Solomon Cordwell Buenz 

The new 47-story luxury residential high-rise designed for Chicago’s South Loop has officially broken ground.

Designed by Solomon Cordwell Buenz and built by Walsh Construction, the new tower will comprise 500 luxury rental units and 188 parking spots. In addition to the residential aspect, the tower will also have 7,500 sf of retail space.

Amenities for the glass high-rise include a library, lounge, dog park, spa, and a rooftop pool. Co-working space and green spaces will also be included. Chicago-based Murphy Development group and Los Angeles-based CIM Group are developing the project.

The building, which is scheduled for a 2019 opening, will be constructed to LEED Certified standards.

Walsh Construction has already completed a 40-story tower in the city’s South Loop and is currently working on another 33-story apartment building.

 

Related Stories

High-rise Construction | Jun 28, 2016

CTBUH names winners and finalists for 2016 Tall Building Awards

Eight winners were named in five categories that recognized tall buildings, urban habitats, innovation, performance, and decade-long excellence.

High-rise Construction | Jun 15, 2016

WilkinsonEyre designs diamond-patterned Bay Park Centre for Toronto

A sloping plaza with trees, grass, and gardens connects the two downtown towers.

Sponsored | High-rise Construction | Jun 13, 2016

Marilyn Monroe’ tower adds curves to the Toronto skyline

Made of glass, concrete, and steel, the 56-story tower has been dubbed the "Marilyn Monroe" because of its curving lines.

High-rise Construction | Jun 7, 2016

Gensler’s Gateway Tower picks up where Calatrava's Chicago Spire left off

A new 2,000-foot tower has been proposed for a site that is currently a non-monument to an abandoned plan.

Codes and Standards | May 25, 2016

LEED Dynamic is worth the effort, says commercial real estate executive

San Diego office tower is California’s first office building to receive LEED Dynamic plaque in recertification.  

Building Team Awards | May 20, 2016

Pittsburgh's Tower at PNC Plaza raises the bar on high-rise greenness

The Building Team designed the 800,000-sf tower to use 50% less energy than a comparable building. A 1,200-sf mockup allowed the team to test for efficiency, functionality, and potential impact on the building’s occupants.

High-rise Construction | May 17, 2016

Foster + Partners-designed towers approved as part of massive neighborhood redevelopment in San Francisco

One of Oceanwide Center’s buildings will be the city’s second tallest. 

Green | May 16, 2016

Development team picked for largest Passive House project in North America

The 24-story curved building would be 70% more efficient than comparable housing in New York City.

High-rise Construction | May 2, 2016

UPDATED* Construction to begin this summer in Chicago on Studio Gang’s Vista Tower

The 1,186-foot tower will be the third-tallest building in the city.  

Wood | Apr 29, 2016

Anders Berensson Architects designs 40-story wooden skyscraper for Stockholm

The structure, which will be made entirely out of cross-laminated timber, will rise 436 feet into the air, making it Stockholm’s tallest building.

boombox1
boombox2
native1

More In Category




Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021