flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Construction begins on Goettsch Partners-designed Nanning China Resources Center Tower

High-rise Construction

Construction begins on Goettsch Partners-designed Nanning China Resources Center Tower

The tower's design is derived from its multiple uses, which include 170,000 sm of Class A office space, 5,000 sm of boutique retail, and a 45,000-sm luxury Shangri-La hotel.


By Goettsch Partners | April 17, 2015
Goettsch Partners unveils designs for Nanning China Resources Center Tower

The massing of the building steps and tapers to accommodate the changing floor plates of the various program types to offer a form that is efficient and identifiable. Renderings courtesy Goettsch Partners

Goettsch Partners (GP) announced the start of consturction on the 445-meter-tall mixed-use Nanning China Resources Center Tower. The tower is located in Nanning, capital of the Guangxi Province, and is situated along Minzu Avenue in the heart of the city's Fengling District. 

The 255,000-sm tower is linked to public transportation through underground connections at the B1 level, and to adjacent buildings via indoor and outdoor pedestrian corridors at the ground and sixth floors, respectively.

The tower's design is derived from its multiple uses, which include 170,000 sm of Class A office space, 5,000 sm of boutique retail, and a 45,000-sm luxury Shangri-La hotel. The massing of the building steps and tapers to accommodate the changing floor plates of the various program types to offer a form that is efficient and identifiable.

“The overall effect of the tower is of a crystalline form ascending to the sky; culminating in an illuminated beacon that will define the new Nanning skyline,” says Paul De Santis, LEED AP, Principal at GP.

The angled geometries of the façades are designed to reinforce the crystalline form while celebrating the tower’s verticality. Entirely encased in floor-to-ceiling high-performance glass, the skin design features integrated ceramic shading elements that offer added solar control while maintaining ample natural light without obstructing views.

The building was designed to LEED-NC Gold standards and the the high performing façade is one of many features that are holistically integrated toward reducing the project's environmental footprint.

“The tower will not only be a symbol for Nanning’s fast growing economic prosperity but a bold symbol of its dedication to environmental responsibility upon its completion in 2019,” says Travis Soberg, AIA, principal at GP.

Once the tower is completed, it will be the tallest building in Nanning.

 

Related Stories

High-rise Construction | Dec 20, 2017

Another record year for high-rise construction

More than 140 skyscrapers were completed across the globe this year, including 15 supertall towers.

High-rise Construction | Oct 4, 2017

90-story mixed-use building could become Denver’s first supertall tower

Manhattan-based Greenwich Realty Capital is developing the project.

High-rise Construction | Sep 8, 2017

CTBUH determines fastest elevators and longest runs in the world in new TBIN Study

When it comes to the tallest skyscrapers in the world, the vertical commute in the building becomes just as important as the horizontal commute through the city.

Codes and Standards | Sep 5, 2017

New CTBUH initiatives to investigate link between fire and façades

In wake of Grenfell tragedy, Council forms new workgroup.

Mixed-Use | Aug 30, 2017

A 50-acre waterfront redevelopment gets under way in Tampa

Nine architects, three interior designers, and nine contractors are involved in this $3 billion project.

Codes and Standards | Aug 7, 2017

Council on Tall Buildings and Urban Habitat to create standards to measure floor area

The standards will examine existing codes and regulations to find where they are too broad or contentious.

High-rise Construction | Aug 1, 2017

Construction on the world’s skinniest tower halts due to ballooning costs

The planned 82-story tower has stalled after completing just 20 stories.

Wood | Jun 13, 2017

The first timber high-rise in the U.S. set for construction in Portland

The building’s design, building materials, and commercial tenants are all focused on the key aspect of sustainability.

Office Buildings | May 30, 2017

How tech companies are rethinking the high-rise workplace

Eight fresh ideas for the high-rise of the future, from NBBJ Design Partner Jonathan Ward.

Mixed-Use | May 23, 2017

45-story tower planned for Miami Worldcenter

Pickard Chilton Architects will design the 600,000-sf 110 10th Street.

boombox1
boombox2
native1

More In Category




Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021