flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Construction begins on Goettsch Partners-designed Nanning China Resources Center Tower

High-rise Construction

Construction begins on Goettsch Partners-designed Nanning China Resources Center Tower

The tower's design is derived from its multiple uses, which include 170,000 sm of Class A office space, 5,000 sm of boutique retail, and a 45,000-sm luxury Shangri-La hotel.


By Goettsch Partners | April 17, 2015
Goettsch Partners unveils designs for Nanning China Resources Center Tower

The massing of the building steps and tapers to accommodate the changing floor plates of the various program types to offer a form that is efficient and identifiable. Renderings courtesy Goettsch Partners

Goettsch Partners (GP) announced the start of consturction on the 445-meter-tall mixed-use Nanning China Resources Center Tower. The tower is located in Nanning, capital of the Guangxi Province, and is situated along Minzu Avenue in the heart of the city's Fengling District. 

The 255,000-sm tower is linked to public transportation through underground connections at the B1 level, and to adjacent buildings via indoor and outdoor pedestrian corridors at the ground and sixth floors, respectively.

The tower's design is derived from its multiple uses, which include 170,000 sm of Class A office space, 5,000 sm of boutique retail, and a 45,000-sm luxury Shangri-La hotel. The massing of the building steps and tapers to accommodate the changing floor plates of the various program types to offer a form that is efficient and identifiable.

“The overall effect of the tower is of a crystalline form ascending to the sky; culminating in an illuminated beacon that will define the new Nanning skyline,” says Paul De Santis, LEED AP, Principal at GP.

The angled geometries of the façades are designed to reinforce the crystalline form while celebrating the tower’s verticality. Entirely encased in floor-to-ceiling high-performance glass, the skin design features integrated ceramic shading elements that offer added solar control while maintaining ample natural light without obstructing views.

The building was designed to LEED-NC Gold standards and the the high performing façade is one of many features that are holistically integrated toward reducing the project's environmental footprint.

“The tower will not only be a symbol for Nanning’s fast growing economic prosperity but a bold symbol of its dedication to environmental responsibility upon its completion in 2019,” says Travis Soberg, AIA, principal at GP.

Once the tower is completed, it will be the tallest building in Nanning.

 

Related Stories

| Oct 4, 2011

GREENBUILD 2011: Methods, impacts, and opportunities in the concrete building life cycle

Researchers at the Massachusetts Institute of Technology’s (MIT) Concrete Sustainability Hub conducted a life-cycle assessment (LCA) study to evaluate and improve the environmental impact and study how the “dual use” aspect of concrete.

| Sep 20, 2011

Jeanne Gang wins MacArthur Fellowship

Jeanne Gang, a 2011 MacArthur Fellowship winner described by the foundation as "an architect challenging the aesthetic and technical possibilities of the art form in a wide range of structures."

| Sep 14, 2011

Lend Lease’s role in 9/11 Memorial & Museum

Lend Lease is honored to be the general contractor for the National September 11 Memorial & Museum project at the World Trade Center site in New York City.

| Sep 14, 2011

Thornton Tomasetti’s Poon named to the Council on Tall Buildings and Urban Habitat’s Board of Trustees

 During his 30-plus years of experience, Poon has been responsible for the design and construction of super high-rise structures, mixed-used buildings, hotels, airports, arenas and residential buildings worldwide. 

| Sep 6, 2011

Construction on Beijing's tallest building starts next week

The 108 floor mixed-use skyscraper consists of offices, apartments, hotels and shopping malls on the lower floors.

| May 25, 2011

World’s tallest building now available in smaller size

Emaar Properties teamed up with LEGO to create a miniature version of the Burj Khalifa as part of the LEGO Architecture series. Currently, the LEGO Burj Khalifa is available only in Dubai, but come June 1, 2011, it will be available worldwide.

| May 17, 2011

Should Washington, D.C., allow taller buildings?

Suggestions are being made that Washington revise its restrictions on building heights. Architect Roger Lewis, who raised the topic in the Washington Post a few weeks ago, argues for a modest relaxation of the height limits, and thinks that concerns about ruining the city’s aesthetics are unfounded.

| Apr 19, 2011

15 mind-blowing skyscrapers

Our friends at Inhabitat have rounded up 15 incredible buildings—from underground cities to vertical farms to bio-fuel power plants and skyscrapers.

| Mar 22, 2011

Mayor Bloomberg unveils plans for New York City’s largest new affordable housing complex since the ’70s

Plans for Hunter’s Point South, the largest new affordable housing complex to be built in New York City since the 1970s, include new residences for 5,000 families, with more than 900 in this first phase. A development team consisting of Phipps Houses, Related Companies, and Monadnock Construction has been selected to build the residential portion of the first phase of the Queens waterfront complex, which includes two mixed-use buildings comprising more than 900 housing units and roughly 20,000 square feet of new retail space.

| Mar 11, 2011

Chicago office building will serve tenants and historic church

The Alter Group is partnering with White Oak Realty Partners to develop a 490,000-sf high-performance office building in Chicago’s West Loop. The tower will be located on land owned by Old St. Patrick’s Church (a neighborhood landmark that survived the Chicago Fire of 1871) that’s currently being used as a parking lot.

boombox1
boombox2
native1

More In Category




Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021