flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Construction growth looking up: Gilbane Spring 2014 Economic Report

Construction growth looking up: Gilbane Spring 2014 Economic Report

Construction spending for 2014 should finish 6.6% higher than in 2013, with nonresidential work contributing substantially.


By Gilbane | May 14, 2014
Courtesy Wikimedia Commons
Courtesy Wikimedia Commons

Gilbane has released its Spring 2014 edition of the periodic report "Construction Economics: Market Conditions in Construction" (download the full report).

Among the findings from the Executive Summary:

CONSTRUCTION GROWTH IS LOOKING UP

  • Construction Spending for 2014 will finish the year 6.6% higher than 2013. Nonresidential buildings will contribute substantially to the growth. 
  • The Architecture Billings Index (ABI) in 2013 dropped below 50 in April, November and December briefly, indicating declining workload. Overall the ABI portrays a good leading indicator for future new construction work. 
  • Selling price data for 2013 shows contractors adding to their margins.
  • Construction jobs grew by 156,000 in 2013, less than anticipated. However, hours worked also grew by 3%, the equivalent of another 150,000+ jobs. 

SOME ECONOMIC FACTORS ARE STILL NEGATIVE

  • We are experiencing a slight slowdown in construction spending that could last through May, influenced by a slight dip in nonresidential buildings and a brief flattening in residential, but more so by a steep decline in nonbuilding infrastructure spending. The monthly rate of spending for nonbuilding infrastructure may decline by 10% through Q3 2014.
  • The construction workforce and hours worked is still 22% below the 2006 peak. At peak average growth rates, it will take a minimum of five more years to return to previous peak levels. 
  •  Construction volume is 23% below peak inflation adjusted spending, which was almost constant from 2000 through 2006. At average peak growth rates of 8% per year, and factoring out inflation to get real volume growth, it will take eight more years to regain previous peak volume levels. 
  • As workload expands in the next few years, a shortage of available skilled workers may have a detrimental effect on cost, productivity and the ability to readily increase construction volume.

THE EFFECTS OF GROWTH

  • Construction spending during the first five months of 2013 declined from the rate of spending in Q4 2012. Growth has been inconsistent, even in the booming residential sector, which has seen recent declines. We see more consistent growth in 2014 for buildings. 
  • As spending continues to increase, contractors gain more ability to pass along costs and increase margins. The growth in contractor margins slowed since last year. However, expected increases in volume should reverse that in 2014.
  • ENR’s Third Quarter 2013 Cost Report shows general purpose and material cost indices increased on average about 2% to 2.5% year over year. However, selling price indices increased 4% on average. The difference between these indices is increased margins. 

IMPACT OF RECENT EVENTS

  • There are several reasons why spending is not rapidly increasing: public sector construction remains depressed as sequestration continues; the government is spending less on schools and infrastructure; lenders are just beginning to loosen lending criteria; consumers are still cautious about increasing debt load, including the consumers’ share of public debt and we may be constrained by a skilled labor shortage.
  • Supported by overall positive growth trends for year 2014, Gilbane expects margins and overall escalation to climb more rapidly than we have seen in six years.
  • Growth in nonresidential buildings and residential construction in 2014 will lead to more significant labor demand, resulting in labor shortages and productivity losses. Margins regained a positive footing in 2012 and extended those gains in 2013. Expect margins to grow stronger in 2014. When activity picks up in all sectors, escalation will begin to advance rapidly.

Click here to download the complete report and a list of data sources.

 

 

ABOUT THIS REPORT
Gilbane Inc. is a full service construction and real estate development company, composed of Gilbane Building Company and Gilbane Development Company. The company (www.gilbaneco.com) is one of the nation’s largest construction and program managers providing a full slate of facilities related services for clients in education, healthcare, life sciences, mission critical, corporate, sports and recreation, criminal justice, public and aviation markets. Gilbane has more than 50 offices worldwide, with its corporate office located in Providence, Rhode Island. The information in this report is not specific to any one region. 

Author Ed Zarenski, a 40-year construction veteran and a member of the Gilbane team for 35 years, is an estimating executive who has managed multi-million dollar project budgeting, owner capital plan cost control, value engineering and life cycle cost analysis. He compiles economic information and provides data analysis and opinion for this quarterly report. Email Zarenski at EZarenski@Gilbaneco.com.

    Related Stories

    Multifamily Housing | Apr 12, 2024

    Habitat starts leasing Cassidy on Canal, a new luxury rental high-rise in Chicago

    New 33-story Class A rental tower, designed by SCB, will offer 343 rental units. 

    Student Housing | Apr 12, 2024

    Construction begins on Auburn University’s new first-year residence hall

    The new first-year residence hall along Auburn University's Haley Concourse.

    K-12 Schools | Apr 11, 2024

    Eric Dinges named CEO of PBK

    Eric Dinges named CEO of PBK Architects, Houston.

    Construction Costs | Apr 11, 2024

    Construction materials prices increase 0.4% in March 2024

    Construction input prices increased 0.4% in March compared to the previous month, according to an Associated Builders and Contractors analysis of the U.S. Bureau of Labor Statistics’ Producer Price Index data released today. Nonresidential construction input prices also increased 0.4% for the month.

    Healthcare Facilities | Apr 11, 2024

    The just cause in behavioral health design: Make it right

    NAC Architecture shares strategies for approaching behavioral health design collaboratively and thoughtfully, rather than simply applying a set of blanket rules.

    K-12 Schools | Apr 10, 2024

    A San Antonio school will provide early childhood education to a traditionally under-resourced region

    In San Antonio, Pre-K 4 SA, which provides preschool for 3- and 4-year-olds, and HOLT Group, which owns industrial and other companies, recently broke ground on an early childhood education: the South Education Center.

    University Buildings | Apr 10, 2024

    Columbia University to begin construction on New York City’s first all-electric academic research building

    Columbia University will soon begin construction on New York City’s first all-electric academic research building. Designed by Kohn Pedersen Fox (KPF), the 80,700-sf building for the university’s Vagelos College of Physicians and Surgeons will provide eight floors of biomedical research and lab facilities as well as symposium and community engagement spaces. 

    K-12 Schools | Apr 10, 2024

    Surprise, surprise: Students excel in modernized K-12 school buildings

    Too many of the nation’s school districts are having to make it work with less-than-ideal educational facilities. But at what cost to student performance and staff satisfaction? 

    Industrial Facilities | Apr 9, 2024

    Confessions of a cold storage architect

    Designing energy-efficient cold storage facilities that keep food safe and look beautiful takes special knowledge.

    Cultural Facilities | Apr 8, 2024

    Multipurpose sports facility will be first completed building at Obama Presidential Center

    When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.

    boombox1
    boombox2
    native1

    More In Category


    Urban Planning

    Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

    Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



    Libraries

    Reasons to reinvent the Midcentury academic library

    DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

    halfpage1

    Most Popular Content

    1. 2021 Giants 400 Report
    2. Top 150 Architecture Firms for 2019
    3. 13 projects that represent the future of affordable housing
    4. Sagrada Familia completion date pushed back due to coronavirus
    5. Top 160 Architecture Firms 2021