flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Construction on Orlando’s massive ‘innovation hub’ is finally starting

Mixed-Use

Construction on Orlando’s massive ‘innovation hub’ is finally starting

The $1 billion Creative Village development will create a business and education hub.


By John Caulfield, Senior Editor | May 10, 2015
Construction on Orlando’s massive ‘innovation hub’ is finally starting

This mixed-use project, which had been delayed for a number of years, is already being touted as mecca for business, colleges, and residents. Rendering courtesy Creative Village Development 

The 68-acre, $1 billion Creative Village project in downtown Orlando, the largest transit-oriented project in central Florida, is expected to break ground on May 14.

This mixed-use project, which had been delayed for a number of years, is already being touted as mecca for business, colleges, and residents. The Orlando Business Journal reports that the University of Central Florida has committed to anchor the Village with a $207 million downtown campus that would create 4,000 jobs. UCF has stated its intention to bring 6,000 students downtown.

Creative Village is a public/private partnership between the City of Orlando and the Master Developer, Creative Village Development; a joint venture between Banc of America Community Development Corporation, and a local developer-investment team lead by Ustler Development. Baker Barrios Architects, the project’s design architect; and Emerge Real Estate Ventures, are part of that group.

The city’s Amway Arena was demolished in 2012 to make way for Creative Village. That demolition’s debris—including 94 million pounds of concrete and 13 million pounds of steel—was recycled and/or sorted for future reuse to build Creative Village’s infrastructure.

The development expected to take 15 to 20 years to complete, and include when finished 1.2 million sf of office and creative space, 500,000 sf of education space, 1,500 housing units, and 225 hotel rooms. A PS-8 school is planned nearby. Construction will create 6,500 jobs, and the Village would offer 5,000 permanent jobs. The Building Team estimates that Creative Village would also generate between $800 million and $1 billion in new development.

Road and utility work in Phase 1 would accommodate the expansion of the Lynz Lymmo bus circulator system to Orlando’s west side, near the Parramore District. Craig Ustler, MAI, CCIM, president of Ustler Development, said that about $13 million in infrastructure work on the bus route and the building paths is already taking shape.

Vertical construction is scheduled to begin in later 2015 or early 2016.

Related Stories

High-rise Construction | Nov 1, 2016

Winthrop Square will give rise to Boston’s second tallest building

The building will become the tallest residential tower in the city.

Mixed-Use | Oct 31, 2016

New Frank Gehry project on Sunset Boulevard moves forward with a few compromises

Among the compromises, the 8150 Sunset Blvd. project will see its tallest residential tower reduced by 56 feet.

Mixed-Use | Sep 27, 2016

10 Design wins competition to design huge mixed-use development in China

China Resources Land, New Fenghong Real Estate Development, and China Resources Trust have designated 50 billion yuan for the construction of the development.

High-rise Construction | Sep 12, 2016

Bangkok’s tallest tower is also one of its most unique

At 1,030 feet tall, MahaNakhon Tower’s height is only outdone by its arresting design.

Mixed-Use | Sep 9, 2016

Rolled book scroll-inspired mixed-use project from Aedas planned for Chongqing, China

With a bookstore at the heart of the development, the project looks to exemplify an ancient Chinese proverb that says “knowledge brings wealth.”

Mixed-Use | Sep 8, 2016

Former sports stadium to become landscaped gardens, housing, and shops

According to the architects, Maison Edouard François, the project will act as a new green lung for the densely populated neighborhood.

Mixed-Use | Aug 16, 2016

Goettsch Partners completes mixed-use tower in R&F Yingkai Square

The 66-story building is now the 7th tallest completed building in Guangzhou.

High-rise Construction | Jul 26, 2016

Perkins+Will unveils plans for what will be Atlanta’s second-tallest tower

The 74-story 98 Fourteenth Street will be a mixed-use building with retail space and luxury residential units.

Mixed-Use | Jul 18, 2016

Studio Libeskind designs jagged mixed-use tower for Lithuania’s capital

The glass facade, and spaces for restaurants, a luxury hotel, and offices will lure visitors and tenants.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021