flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Construction of record breaking glass-bottom bridge nearly complete in China

Glass and Glazing

Construction of record breaking glass-bottom bridge nearly complete in China

Visitors can see the gorge beneath them from nearly 1,000 feet above


By BD+C Staff | June 4, 2015
Construction of record breaking glass-bottom bridge nearly complete in China

Designed by Israeli architect Haim Dotan, the white bridge is meant to look as if it is “disappearing into the clouds.” Renderings: Haim Dotan

The world’s longest and highest glass-bottomed pedestrian bridge is nearing completion in the Zhangjiajie National Park, China, ArchDaily reports.

Expected to wrap up in July and opening to the public in October 2015, visitors to the park will be able to walk 0.2 miles at nearly 1,000 feet above a canyon, with views of a verdant gorge visible through glass panels beneath them.

The bridge’s designer, Haim Dotan, told ArchDaily that “the Zhangjiajie Glass Bridge was designed to be invisible as possible—a white bridge disappearing into the clouds.”

ArchDaily has the full report.

 

Related Stories

| Oct 22, 2012

Two-Hour Curtain Wall Lets Light In and Keeps Fire Out at Prairie Hills Junior High School

New school’s south-facing elevation features a glazed aluminum curtain wall that incorporates PPG Solarblue and PPG Solarban 60 glazing.

| Jul 16, 2012

Business school goes for maximum vision, transparency, and safety with fire rated glass

Architects were able to create a 2-hour exit enclosure/stairwell that provided vision and maximum fire safety using fire rated glazing that seamlessly matched the look of other non-rated glazing systems.

| Jun 29, 2012

Guardian launches industry’s first glass visualizer for interior design

Online tool allows designers to explore the possibilities of glass.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| Jun 1, 2012

AIA 2030 Commitment Program reports new results

The full report contains participating firm demographics, energy reduction initiatives undertaken by firms, anecdotal accounts, and lessons learned.

| May 31, 2012

Product Solutions June 2012

Curing agents; commercial faucets; wall-cladding systems.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

boombox1
boombox2
native1

More In Category



Glass and Glazing

The next generation of thermal glazing: How improving U-value can yield energy savings and reduce carbon emissions

The standards for energy-efficient construction and design have been raised. Due to the development of advanced low-e coatings for the interior surface and vacuum insulating technologies, architects now have more choices to improve U-values wherever enhanced thermal performance is needed to create eco-friendly spaces. These options can double or even triple thermal performance, resulting in annual energy savings and a positive return on carbon.


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021