flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Construction on the tallest residential tower in western Europe could start early next year

High-rise Construction

Construction on the tallest residential tower in western Europe could start early next year

China’s Greenland Group is the developer of four of the world’s 10 largest skyscrapers


By John Caulfield, Senior Editor | September 8, 2016

The 67-story Spire London will have separate entrances for tenants of affordable and pricier apartments. At 771 feet high, it would be Europe's tallest residential tower. Image: Greenland Group

Greenland Group, Shanghai’s biggest property developer, is moving forward on an £800 million (US$1.066 billion) project in London that could be the tallest residential building in western Europe.

Spire London, as it’s being called, will rise 235 meters, or 771 feet, near the City’s Canary Wharf. Ninety-six of the building’s 861 apartments will be priced affordability and have access to third-floor communal amenities such as meeting rooms, games room, and a music/learning/cultural space. 

However, so-called “social” tenants housed on the lower floors will enter the 67-story building through a separate door. Affluent private buyers will be ferried to their ritzier apartments, ranging in size from 50 to 150 sm (538 to 1,614 sf) and in price from £595,000 to £3 million, on the upper floors and penthouse via nine dedicated elevators. Their amenities include a 35th-floor club, infinity pool, and cinema.

(To put these prices into some context, the average price of a home in London in August, unadjusted for seasonality, was £206,145, according to the Nationwide House Price Index.)

HOK is the architect for Spire London, and Greenland Group released renderings of the building yesterday. Its design is said to be based on the nautical history of the dock site, and by the orchid, which China first cultivated more than 3,000 years ago.

The building’s angled roof creates terraces for upper-level apartments, and louvers will provide natural ventilation.

 

 

Spire London is one of 400 towers 20 stories or more that are either under construction or in the planning stages in London. Image: Greenland Group

 

Construction work on Spire London is scheduled to begin in January and be completed by 2020.  This is one of 400 high rises over 20 stories tall that are in construction or planning stages in London, 270 of which would be in the inner boroughs. Last month, an Ipsos Mori survey of more than 500 Londoners, commissioned by the anti-skyscraper Skyline Campaign, revealed that nearly half (49%) think that’s too many skyscrapers, versus 34% in outer boroughs who feel the same way.

Nearly three-fifths of all Londoners support restrictions on the number of skyscrapers that can be built, partly because they remain unconvinced that these tall buildings are meeting the City’s housing needs. Nearly three-quarters of respondents also want their communities to have more say in the design of these high rises.

However, foreign investment in UK real estate is not likely to be discouraged at a time when the country is trying to sort out where it stands, post-Brexit, in terms of international trade and commerce.

 

Where Spire London would stand compared to other tall buildings in London. Chart: The Guardian

Related Stories

High-rise Construction | Jan 6, 2017

76-Story luxury apartment tower in Chicago’s South Loop gets name and begins construction

The building was designed by Rafael Viñoly and is scheduled for completion in 2019.

High-rise Construction | Jan 4, 2017

In search of better data to optimize tall buildings

In spite of the ability to build tall and taller buildings—usually fully glazed, often in extreme climates with increasingly smart technologies—it could be argued that we are not similarly “rising to the occasion” in terms of optimization, writes Gensler's Russell Gilchrist.

High-rise Construction | Dec 15, 2016

Shenzhen’s newest supertall tower has topped out

The 350-meter-high building was designed by Morphosis and will provide over 2 million sf of office and retail space.

High-rise Construction | Dec 13, 2016

The tallest building in Manhattan’s Meatpacking district tops out

The office, designed by CetraRuddy, will be completed in 2017.

High-rise Construction | Dec 6, 2016

New York’s One Vanderbilt to have publicly accessible observation deck 1,020-feet above ground

The building, designed by Kohn Pedersen Fox and developed by SL Green, will stand 1,401 tall.

High-rise Construction | Dec 2, 2016

Agora Garden, a twisting, plant-filled tower in Taipei, will absorb 130 tons of carbon dioxide annually once completed

The building sits just a few blocks from the LEED-Platinum certified Taipei 101, the world’s eighth tallest building.

High-rise Construction | Nov 7, 2016

Shanghai Tower wins CTBUH’s “Best Tall Building Worldwide” award for 2016

Shanghai Tower beat out three other finalists selected from 132 entries from around the world for the award.

High-rise Construction | Nov 3, 2016

Two identical Kohn Pederson Fox office towers may be headed to Wacker Drive

Murphy Development Group is looking for tenants for the $800 million project.

High-rise Construction | Nov 1, 2016

The world’s 100 tallest buildings: Which wind consultants have worked on the most?

The top firm has worked on almost half of the world’s 100 tallest buildings.

High-rise Construction | Nov 1, 2016

LEGOLAND Dubai unveils the Brick Khalifa, the world’s tallest LEGO replica building

The model is on display at the newly opened LEGOLAND Dubai.

boombox1
boombox2
native1

More In Category




Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021