The Council on Tall Buildings and Urban Habitat (CTBUH) released an original “Tall Buildings in Numbers” (TBIN) research study entitled Vertical Transportation: Ascent & Acceleration. The study began as a collaboration with Guinness World Records to identify the commercial building with the fastest elevator speeds and longest vertical runs, which turned out to be Shanghai Tower, China. Expanding on this research, the Council determined the top buildings in each category and uncovered a number of other intriguing vertical transportation superlatives along the way.
When it comes to the tallest skyscrapers in the world, the vertical commute in the building becomes just as important as the horizontal commute through the city. Innovations in vertical transportation systems allow passengers to get to their destinations more quickly, and with less stops along the way. It is no surprise then that the world record-holder for fastest elevators also happens to be the second tallest building in the world at 632 meters.
With elevators speeds topping out at 20.5 meters per second (m/s), Shanghai Tower (Shanghai, China) narrowly surpasses CTF Finance Center (Guangzhou, China), which boasts speeds of up to 20 m/s. Meanwhile, Taipei 101 (Taipei, Taiwan) trails at 16.83 m/s, following by Landmark Tower (Yokohama, Japan) at 12.5 m/s and Two International Finance Center (Hong Kong, China) at 10.6 m/s.
Shanghai Tower also features the tallest continuous elevator run at 578.55 meters. These elevators whisk visitors all the way from the basement, to the observation deck near the top of the 632-meter building. Following closely is Ping An Finance Center (Shenzhen, China), with elevators running a continuous 573.5 meters, just meters short of the building’s 599-meter pinnacle.
Looking to the future, Saudi Arabia’s under-construction Jeddah Tower, with a projected height exceeding 1,000 meters, is poised to challenge these records. The tower will reportedly feature an elevator run of 660 meters and double-decker elevators that exceed the current record of 10 m/s for such systems.
An interactive version of this study is available online, exploring details on the collected project data. Additionally, the study is included within the 2017 Issue III of the CTBUH Journal. Purchase a copy of the journal here.
Related Stories
Reconstruction & Renovation | Feb 2, 2017
$500 million investment will modernize Chicago’s Willis Tower *Updated*
The project will be the first major renovation in the building’s 43-year history.
High-rise Construction | Feb 1, 2017
Rippled tower from CORE will be first of 10-tower master plan in Mississauga, Ont.
The tower will become the tallest building in what is Canada’s 6th largest city.
High-rise Construction | Jan 31, 2017
Chicago’s West Loop to receive 500-foot apartment tower
The 44-story tower will provide 492 rental units and a retail podium.
High-rise Construction | Jan 27, 2017
Silverstein Properties waffles on what to do with Far West Side property
The company has gone from a two-tower design, to a supertall, and now, supposedly, back to a two-tower design.
High-rise Construction | Jan 26, 2017
Paris tower provides office space and three hotel complexes across its three superimposed volumes
Equipped with hanging gardens and a panoramic viewpoint for its top tier, Jardins de l’Arche Tower will rise in Paris’s La défense business district.
Architects | Jan 24, 2017
Politicians use architectural renderings in bid to sell Chicago’s Thompson Center
The renderings are meant to show the potential of the site located in the heart of the Chicago Loop.
High-rise Construction | Jan 23, 2017
Growth spurt: A record-breaking 128 buildings of 200 meters or taller were completed in 2016
This marks the third consecutive record-breaking year for building completions over 200 meters.
High-rise Construction | Jan 20, 2017
CTBUH’s tall building predictions for 2017
Woodscrapers, the automobile industry's expansion into the tall building development business, and Nairobi's climb toward becoming Africa's skyscraper hub are just a few of the topics CTBUH's 2017 tall building predictions report focuses on.
High-rise Construction | Jan 19, 2017
Goettsch Partners to design Shenzhen-based headquarters complex
The Chicago architecture firm won a design competition for the project anticipated to be completed in 2019.
High-rise Construction | Jan 6, 2017
76-Story luxury apartment tower in Chicago’s South Loop gets name and begins construction
The building was designed by Rafael Viñoly and is scheduled for completion in 2019.