flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Denver builds the nation’s first carbon-positive hotel

Hotel Facilities

Denver builds the nation’s first carbon-positive hotel

Designed by Studio Gang, the 13-floor hotel will feature eye-shaped windows inspired by the area’s Aspen trees.


By Novid Parsi, Contributing Editor | August 12, 2022
Populus Hotel ext 1
Courtesy Studio Gang.

Touted as the nation’s first carbon-positive hotel, Populus recently broke ground in downtown Denver. Scheduled to open in late 2023, Populus is a 13-story, 265-room hotel with a rooftop restaurant and bar, all designed by Studio Gang.

Developed by Urban Villages, the triangular-shaped, 130,000-square-foot building will be entirely carbon positive, from construction to operations. Populus will minimize its carbon footprint in the development stage by using low-carbon concrete mixes and high-recycled content materials, maximizing structural efficiency, using fewer finish materials, and minimizing waste. The team will consider the carbon footprint of the origin and creation of the materials as well as their transport. The hotel’s overall use (operational carbon) and every guest stay will be offset, in addition to the building’s embodied carbon.

The project also will involve an offsite ecological effort, including an initial commitment to plant trees that represent over 5,000 acres of forest, offsetting the equivalent of nearly 500,000 gallons of gas.

With design by Studio Gang, and with the Beck Group as the architect of record, Populus draws inspiration from the area’s iconic Aspen tree. Studio Gang designed the hotel, its first building in Colorado, with eye-shaped windows that echo the Aspen eyes. As part of the overall green vision, “lids” over each window extend slightly outward to shade the interior, improve energy performance, and channel rainwater.

Inside, the windows change in size to reflect the public or private aspect of various spaces—with windows up to 30 feet high at the building’s base. In the rooms, the windows not only provide immersive mountain and city views but also serve as seats or desks, further connecting occupants with the outdoors. 

“Improving the resiliency of our cities has never been more urgent—and it includes reducing carbon emissions as well as strengthening community bonds,” Jeanne Gang, founder of Studio Gang, said in a statement. “We’ve designed Populus to be a new destination in downtown Denver that combines these environmental and social ambitions.”

On the Building Team:
Owner and/or developer: Urban Villages
Design architect: Studio Gang
Architect of record: The Beck Group
MEP engineer: Klok Group
Structural engineer: Studio NYL
General contractor/construction manager: Matt Archuletta

Populus Hotel ext 2
Courtesy Studio Gang.
Populus Hotel ext 3
Courtesy Studio Gang.

 

Related Stories

Modular Building | Jan 12, 2017

The largest modular construction hotel project in New York City is starting to get pieced together

The hotel’s 300 rooms are made from 210 prefabricated pods from Polcom Modular.

Hotel Facilities | Nov 15, 2016

Mountain Forest Hotel looks to restore the natural landscape while offering visitors 250 luxury rooms

The hotel looks to create a symbiosis between man, nature, and architecture.

Industry Research | Sep 28, 2016

Worldwide hotel construction shows modest year-over-year growth

Overall construction for hotel projects is up, but the current number of hotels currently being built has dipped slightly from one year ago.

Hotel Facilities | Sep 26, 2016

$75 million commercial tower and hotel proposed in downtown Atlanta

The tower would be built on a site currently occupied by a Hertz Car Rental and parking lot.

Sponsored | Coatings | Sep 22, 2016

Valspar helps diversify new project amongst iconic downtown Chicago buildings

The 26-story hotel spanning 96,000 square-feet needed a way to not only differentiate itself among the sea of other hotels and buildings lining the riverfront and downtown area, but also fit into the mix aesthetically.

Hotel Facilities | Sep 19, 2016

The Hotel at Oberlin becomes one of only five hotels to achieve LEED Platinum

The Hotel at Oberlin anchors the Peter B. Lewis Gateway Center, the cornerstone of Oberlin’s Green Arts District.

Hotel Facilities | Sep 15, 2016

Developer reveals plans for 175-room hotel across from Wrigley Field

The hotel will provide a four-star experience to guests during baseball season and, just as importantly, during the offseason.

Hotel Facilities | Sep 7, 2016

Fish out of water: The site of a Birdseye frozen-food factory in Gloucester, Mass., transforms into a seaside hotel

The construction of this 94-room hotel and conference center pitted tourism proponents against locals who want to preserve this historic city’s fishing heritage. 

| Sep 1, 2016

HOTEL SECTOR GIANTS: A ranking of the nation's top hotel sector design and construction firms

Gensler, HKS, Turner Construction Co., The Whiting-Turner Contracting Co., Jacobs, and JBA Consulting Engineers top Building Design+Construction’s annual ranking of the nation’s largest hotel sector AEC firms, as reported in the 2016 Giants 300 Report.

Hotel Facilities | Aug 29, 2016

Artificial rainforest coming to Dubai hotel courtesy of ZAS Architects

 The faux-rainforest will be located at The Rosemont Hotel & Residences Dubai.

boombox1
boombox2
native1

More In Category



3D Printing

3D-printed construction milestones take shape in Tennessee and Texas

Two notable 3D-printed projects mark milestones in the new construction technique of “printing” structures with specialized concrete. In Athens, Tennessee, Walmart hired Alquist 3D to build a 20-foot-high store expansion, one of the largest freestanding 3D-printed commercial concrete structures in the U.S. In Marfa, Texas, the world’s first 3D-printed hotel is under construction at an existing hotel and campground site.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021