flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Dept. of Labor reaches settlement for $5 million in back wages for workers on federally assisted project

Dept. of Labor reaches settlement for $5 million in back wages for workers on federally assisted project

MDG Design & Construction to pay contractors for failing to pay prevailing wages on rehab of New York apartment tower


By Peter Fabris, Contributing Editor | July 1, 2014
Photo: Dept. of Labor
Photo: Dept. of Labor

The U.S. Department of Labor and MDG Design & Construction LLC have reached a settlement over wage violations atthe federally-assisted 26-story Grand Street Guild rehab project in New York City’s Lower East Side. MDG and other firms involved will pay $3.8 million in back wages and fringe benefits to about 200 of MDG’s subcontractors’ construction workers.

Previous investigations led to the repayment of more than $1.1 million in back wages to 300 laborers and mechanics who worked for MDG’s subcontractors.The contractors have also agreed to expansive compliance measures to prevent future violations.

The labor department’s Wage and Hour Division found numerous Davis-Bacon and Related Acts violations by MDG subcontractors, including failure to pay required prevailing wages and submitting inaccurate or falsified payroll records to the government. As part of the settlement, MDG will retain an independent monitor for three years with responsibilities for conducting regular reviews of the company and its subcontractors to confirm compliance with applicable wage and hour laws on all prevailing wage and federally-assisted projects.

In addition to MDG, the settlement agreement includes Charis Consulting LLC, Kona Contracting LLC, as well as Michael Rooney and Nicola DeAcetis — owners of all three companies — and Neys Escobar, an owner of Kona. All of the companies are based in Huntington Station, N. Y.

(http://www.dol.gov/opa/media/press/whd/WHD20140967.htm)

Related Stories

Codes and Standards | Nov 18, 2020

Commissioning study finds median energy savings of 3% to 16%

Berkeley Lab examines results of commissioning across building types.

Codes and Standards | Nov 17, 2020

Midtown Manhattan’s empty offices could be converted to affordable housing

Advocates envision idle offices re-zoned to alleviate housing crisis.

Codes and Standards | Nov 16, 2020

New concrete detailing manual includes downloadable CAD files

American Concrete Institute document contains guidance on codes for structural concrete.

Codes and Standards | Nov 12, 2020

California rent control measure defeated

Golden State voters reject Proposition 21.

Codes and Standards | Nov 10, 2020

Researchers and industry leaders will form national institute for AI in construction

Goal is to identify high-impact areas for application in design and construction.

Codes and Standards | Nov 6, 2020

Jobsite injuries in New York City decline 20% since 2017

Safety training cited as a cause of improvement.

Codes and Standards | Nov 4, 2020

Commercial building owners having tougher time securing insurance policies and renewals

Insurers’ fears of civil unrest in wake of election prompt builder’s risk coverage moratoriums.

Codes and Standards | Nov 4, 2020

Turn rooftops into revenue generators with solar arrays

Lease or ownership models for PVs make more sense than ever.

Codes and Standards | Nov 3, 2020

The argument against gas stoves includes degraded indoor air quality

Asthma seems to be aggravated by cooking with flame.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021