flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Dept. of Labor reaches settlement for $5 million in back wages for workers on federally assisted project

Dept. of Labor reaches settlement for $5 million in back wages for workers on federally assisted project

MDG Design & Construction to pay contractors for failing to pay prevailing wages on rehab of New York apartment tower


By Peter Fabris, Contributing Editor | July 1, 2014
Photo: Dept. of Labor
Photo: Dept. of Labor

The U.S. Department of Labor and MDG Design & Construction LLC have reached a settlement over wage violations atthe federally-assisted 26-story Grand Street Guild rehab project in New York City’s Lower East Side. MDG and other firms involved will pay $3.8 million in back wages and fringe benefits to about 200 of MDG’s subcontractors’ construction workers.

Previous investigations led to the repayment of more than $1.1 million in back wages to 300 laborers and mechanics who worked for MDG’s subcontractors.The contractors have also agreed to expansive compliance measures to prevent future violations.

The labor department’s Wage and Hour Division found numerous Davis-Bacon and Related Acts violations by MDG subcontractors, including failure to pay required prevailing wages and submitting inaccurate or falsified payroll records to the government. As part of the settlement, MDG will retain an independent monitor for three years with responsibilities for conducting regular reviews of the company and its subcontractors to confirm compliance with applicable wage and hour laws on all prevailing wage and federally-assisted projects.

In addition to MDG, the settlement agreement includes Charis Consulting LLC, Kona Contracting LLC, as well as Michael Rooney and Nicola DeAcetis — owners of all three companies — and Neys Escobar, an owner of Kona. All of the companies are based in Huntington Station, N. Y.

(http://www.dol.gov/opa/media/press/whd/WHD20140967.htm)

Related Stories

Codes and Standards | Nov 2, 2020

Wildfires can make drinking water toxic

Updated building codes could mitigate the danger.

Adaptive Reuse | Oct 26, 2020

Mall property redevelopments could result in dramatic property value drops

Retail conversions to fulfillment centers, apartments, schools, or medical offices could cut values 60% to 90%.

Codes and Standards | Oct 26, 2020

New seismic provisions for the National Earthquake Hazards Reduction Program released

The provisions present a set of recommended improvements to the ASCE/SEI 7-16 Standard.

Codes and Standards | Oct 22, 2020

More than 130 building projects have engaged LEED’s Safety First Credits in response to COVID-19

Best practices helping companies develop and measure healthy, sustainable, and resilient reopening efforts.

Codes and Standards | Oct 21, 2020

New technologies and techniques can ‘future-proof’ buildings

Net-zero principles may give buildings longer lives.

Codes and Standards | Oct 20, 2020

Updated AIA Contractor’s Qualification Statement and Warranty Bond documents available

Statement now includes safety protocols and plans, sustainability, and BIM experience.

Codes and Standards | Oct 19, 2020

NEXT Coalition chooses five pilot projects to fight COVID-19 on jobsites

Mobile platforms, wearable sensors, AI video systems among the trial solutions.

Codes and Standards | Oct 15, 2020

Neighborhoods Now offers cost-effective, DIY designs in response to COVID-19 pandemic

Designs include barriers for outdoor dining, sidewalk retail displays, and modular seating for public spaces.

Codes and Standards | Oct 14, 2020

Standard contract document for prefab and modular building released

ConsensusDocs addresses the most common prefabricated construction use-case scenario.

Codes and Standards | Oct 13, 2020

Austin is first major Texas city to adopt wildfire code

New ordinance based on the International Wildland-Urban Interface Code.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021