flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Design for new San Clemente Marine Safety Headquarters would create new public plaza

Building Team

Design for new San Clemente Marine Safety Headquarters would create new public plaza

Built into a bluff, the new structure would be cradled in the thermal mass of the earth.


By Peter Fabris, Contributing Editor | June 22, 2022
San Clemente Safety Plaza
Courtesy HMC Architects.

A proposed design by HMC Architects for a new San Clemente Marine Safety Headquarters makes creative use of the seaside topography of the Pacific Coast. The design, which recently won an AIA San Diego 2022 Design Award, would place the structure within a bluff, cradled in the thermal mass of the earth. The subterranean space would enjoy plentiful natural light, passive ventilation, and extreme energy efficiency, with the building anticipated to use 87% less energy than average.

Removing the old building would give the beach back to the public, providing 20,000 sf of new public space along the shore. The new public safety facility, the administrative headquarters of the lifeguard corps, would be situated underneath a new public plaza. Many of the facility’s functions, such as loading, maintenance, and storage, are unsightly and occupy valuable public space.

The new design hides these functions below grade while still giving staff uninterrupted views of the beach. On the bluff, extending the terrace outward increases the plaza area 12-fold and the linear footage of seating 25-fold, while maintaining the same amount of planted area.

Built in 1968, the existing structure is a familiar landmark on the Southern California coast. It has fallen into disrepair, due to coastal erosion and harsh salt winds. Renovating the existing structure in its current location would be expensive and would not provide compliance with modern standards. Furthermore, rising sea levels and storm surges will increasingly threaten the property. To avoid this, the architects proposed using the equivalent renovation budget to create a modern facility while expanding space for public enjoyment.

“The transformation of an underutilized hillside into a strong, terraced public plaza, while creatively incorporating existing elements, is commendable,” according to a comment from the AIA San Diego Award Jury.

Building Team:

Owner and/or developer: City of San Clemente
Design architect: HMC Architects
MEP engineer: P2S
Structural engineer: KPFF

Courtesy HMC Architects.
Courtesy HMC Architects
San Clemente Plaza
Courtesy HMC Architects

 

Related Stories

Building Team | Jul 30, 2018

Construction tech is the new investment darling for VC funds

In the first half of 2018, venture capital firms invested $1.05 billion in global construction tech startups, setting a record high.

Building Team | Jun 22, 2018

What owners should know before choosing the design-build project delivery method

Outside of drawing up a well-written contract, owners often overlook a key attribute that can significantly impact the success of a design-build project, writes Skanska’s Julie Hyson.

Building Team | Jun 13, 2018

How your AEC firm's brand affects recruiting top talent

There is a major shift in workforce demographics as upwards of 80 million baby boomers retire over the next fifteen years.

Sponsored | Building Team | May 8, 2018

5 tips to improve employee utilization (and morale)

Ways to increase productivity and revenue, while providing a supportive workplace environment

Architects | Apr 5, 2018

Tech Report 5.0: The Human Touch

Can studying humans at a behavioral level produce better buildings? Cognitive architecture experts are working to find out.

Sponsored | Building Team | Mar 28, 2018

6 strategies to keep your project on budget

Here are six strategies to keep your projects on or even under budget.

Sponsored | | Mar 14, 2018

Getting there may be costing you more

Commercial transportation is getting more expensive, and it’s driving up the price of steel.  

Sponsored | Building Team | Dec 12, 2017

3 tips to address the top causes of budget overruns

The most cited issues are communication breakdowns, inadequate fees for the work provided, and unrealistic deadlines or schedules.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021