flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Design team of Gensler and Manning selected to design The River District

Mixed-Use

Design team of Gensler and Manning selected to design The River District

The mixed-use neighborhood will be built along the Mississippi River in New Orleans.


By David Malone, Associate Editor | June 21, 2021
The River District aerial view
The River District aerial view

Gensler and New Orleans-based architecture firm Manning have been selected as the design team to create a Master Plan for a new residential and mixed-use neighborhood on the Mississippi River called The River District.

The River District will includes new mixed-use residential and commercial spaces that link the Waterhouse and Lower Garden Districts with the Riverfront and Ernest N. Morial Convention Center. The neighborhood will include apartments, including affordable and workforce housing, retail space, restaurants, and other amenities. Entertainment components, such as a music venue, movie theater, and a potential site for a new Civil Rights Museum will also be included.

 

The River District Batture Square

 

The project will be developed on land owned by the New Orleans Ernest N. Morial Convention Center. The River District team of Gensler and Manning was selected by the Convention Center governing board through a public bid process.

Predevelopment work is expected to take up to 18 months.

 

The River District Convention Center

 

The River District Community Park

Tags

Related Stories

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| May 23, 2012

Summit Design+Build selected as GC for Chicago restaurant

Little Goat will truly be a multifunctional space.  Construction plans include stripping the 10,000 sq. ft. building down to the bare structure everywhere, the installation of a new custom elevator and adding square footage at the second floor with an addition.

| Apr 30, 2012

HSA Commercial selected as consultant for Orland Park’s Main Street Triangle project

HSA will be responsible for designing an overall mixed-use merchandise plan, attracting a unique retail tenant mix and completing leases with prospective tenants.

| Apr 20, 2012

Shawmut completes Yard House Restaurant in Boston

12,000-sf restaurant marks new addition to Boston’s Fenway neighborhood.

| Apr 6, 2012

Batson-Cook breaks ground on hotel adjacent to Infantry Museum & Fort Benning

The four-story, 65,000-ft property will feature 102 hotel rooms, including 14 studio suites.

| Apr 4, 2012

JCJ Architecture designs New York City's first casino

Aqueduct Racetrack complex transformed into modern entertainment destination.

| Apr 3, 2012

Luxury hotel 'groundscraper' planned in abandoned quarry

Would you spend $300 a night to sleep underground? You might, once you see the designs for China's latest hotel project.

| Mar 16, 2012

Temporary fix to CityCenter's Harmon would cost $2 million, contractor says

By contrast, CityCenter half-owner and developer MGM Resorts International determined last year that the Harmon would collapse in a strong quake and can't be fixed in an economical way. It favors implosion at a cost of $30 million.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021