Studio Gang has designed a 41-story residential high rise called Ko’ula that would be a central component within the 60-acre Ward Village master-planned community in Honolulu on the island of Oahu in Hawaii.
The tower will include 565 studio, one-, two-, and three-bedroom residences, each with its own lanai, or veranda. The design of the building—which twists as it rises and undulates to create a succession of different floor plans—recalls the shape of red sugarcane plants that once grew in this area.
The Howard Hughes Corporation is the developer on this tower and Ward Village. The design firm Yabu Pushelberg designed Ko’ula’s interiors, which will showcase natural materials, colors, and textures. The project has yet to name its other Building Team members.
A porte cochiere connects the high rise to an expansive courtyard. Image: The Howard Hughes Corporation
The high rise will connect to a public porch that opens onto an expansive courtyard that will serve as another entry point for Ward Village’s Central Plaza, which began construction earlier this year and whose first phase is expected to open to the public in January. The completed tower will include 58,300 sf of dining and retail spaces, 11,000 sf of open spaces, and 58,496 sf of recreational spaces.
Ko’ula’s residents will have exclusive access to a lobby and dropoff area located a level above the street.
A sales office that the design firm Woods Bagot converted from a 1960s-era office building will start taking purchase orders for Ko’ula’s residences later this year. Ko’ula is scheduled to break ground sometime in 2019, although no specific date has been set. Hughes has not disclosed a completion date nor the project’s anticipated cost.
One of the amenities decks within the Ko'ula high rise, which will offer 565 apartments. Image: The Howard Hughes Corporation
The Ward Village district is located between downtown Honolulu and Waikīkī. As part of the district’s redevelopment, Howard Hughes Corporation last summer topped off a 43-story mixed-use tower called Ke Kilohana, with 424 residential units, 375 of which targeting workforce buyers.
When it’s completed, Ward Village will have 4,500 residences and one million sf of retail space. It is part of Ka’kaako, Honolulu’s commercial and retail district for which the city has laid out ambitious expansion plans that include 30 new buildings.
Related Stories
MFPRO+ News | Dec 18, 2023
Berkeley, Calif., raises building height limits in downtown area
Facing a severe housing shortage, the City of Berkeley, Calif., increased the height limits on residential buildings to 12 stories in the area close to the University of California campus.
Sponsored | Multifamily Housing | Dec 13, 2023
Mind the Gap
Incorporating temporary expansion joints on larger construction projects can help avoid serious consequences. Here's why and how.
Giants 400 | Dec 12, 2023
Top 35 Military Facility Construction Firms for 2023
Hensel Phelps, DPR Construction, Walsh Group, and Whiting-Turner top BD+C's ranking of the nation's largest military facility general contractors and construction management (CM) firms for 2023, as reported in Building Design+Construction's 2023 Giants 400 Report.
Giants 400 | Dec 12, 2023
Top 50 Military Facility Engineering Firms for 2023
Jacobs, Burns & McDonnell, WSP, and AECOM head BD+C's ranking of the nation's largest military facility engineering and engineering/architecture (EA) firms for 2023, as reported in Building Design+Construction's 2023 Giants 400 Report.
Giants 400 | Dec 12, 2023
Top 40 Military Facility Architecture Firms for 2023
Michael Baker International, HDR, Whitman, Requardt & Associates, and Stantec top BD+C's ranking of the nation's largest military facility architecture and architecture/engineering (AE) firms for 2023, as reported in Building Design+Construction's 2023 Giants 400 Report.
Codes and Standards | Dec 11, 2023
Washington state tries new approach to phase out fossil fuels in new construction
After pausing a heat pump mandate earlier this year after a federal court overturned Berkeley, Calif.’s ban on gas appliances in new buildings, Washington state enacted a new code provision that seems poised to achieve the same goal.
MFPRO+ News | Dec 11, 2023
U.S. poorly prepared to house growing number of older adults
The U.S. is ill-prepared to provide adequate housing for the growing ranks of older people, according to a report from Harvard University’s Joint Center for Housing Studies. Over the next decade, the U.S. population older than 75 will increase by 45%, growing from 17 million to nearly 25 million, with many expected to struggle financially.
MFPRO+ News | Dec 7, 2023
7 key predictions for the 2024 multifamily rental housing market
2024 will be the strongest year for new apartment construction in decades, says Apartment List's chief economist.
Codes and Standards | Dec 7, 2023
New York City aims to spur construction of more accessory dwelling units (ADUs)
To address a serious housing shortage, New York City is trying to get more homeowners to build accessory dwelling units (ADUs). The city recently unveiled a program that offers owners of single-family homes up to nearly $400,000 to construct an apartment on their property.
MFPRO+ News | Dec 5, 2023
DOE's Zero Energy Ready Home Multifamily Version 2 released
The U.S. Department of Energy has released Zero Energy Ready Home Multifamily Version 2. The latest version of the certification program increases energy efficiency and performance levels, adds electric readiness, and makes compliance pathways and the certification process more consistent with the ENERGY STAR Multifamily New Construction (ESMFNC) program.