flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Details unveiled for Atlanta’s Campus 244 mixed-use development

Mixed-Use

Details unveiled for Atlanta’s Campus 244 mixed-use development

S9 Architecture is designing the project.


By David Malone, Managing Editor | January 13, 2022
Campus 244
Renderings courtesy S9 Architecture

The Georgetown Company and RocaPoint Partners have unveiled new details about Campus 244, a one-million+-sf mixed-use development in Atlanta’s Central Perimeter submarket.

The walkable campus is located on 12.8 acres and will feature a new 145-key Element Hotel, a 400,000-sf adaptive reuse office building, and 25,000-sf of new food and beverage establishments.

Campus 244 exterior

The first phase of the project will include the adaptive reimagining of the existing Gold Kist office building into a five-story, 400,000-sf Class-A office building with a timber overbuild. The workspace will feature 15-foot ceilings, private outdoor terraces, balcony space, and expansive 90,000-sf floor plates that emphasize natural daylight and fresh air throughout. Several post-pandemic workspace features will be included, such as state-of-the-art HVAC systems, touchless elevator and restroom technologies, open staircases, and operable windows.

Campus 244

The first phase will also include an upscale, boutique, 145-key Element Hotel. The hotel will feature a lobby bar that will spill out onto the large greenspace; diverse areas to gather for meetings, remote work, and collaboration; and spots to get coffee with friends and colleagues.

Subsequent phases will include 25,000-sf of restaurant space. The chef-driven restaurant concepts will be located surrounding a central plaza greenspace, providing a connected gathering space for employees on-campus, as well as the local community.

Campus 244 rooftop

Campus 244 will offer convenient, transit-oriented access to Atlanta’s “Pill Hill” healthcare community, State Farm’s office campus, Perimeter Mall, and other surrounding office and retail amenities.

S9 Architecture will handle the design and master planning for Campus 244.

Campus 244 interior

Tags

Related Stories

| Aug 11, 2010

Silver Award: Palmer House Hilton Hotel & Shops Chicago, Ill.

Chicago's Palmer House Hilton holds the record for the longest continuously operated hotel in North America. It was originally built in 1871 by Potter Palmer, one of America's first millionaire developers. When it was rebuilt after the Great Chicago Fire it became the first hotel in the U.S. to put a telephone in every room.

| Aug 11, 2010

Gulf Coast Hotel's Stormy Road to Recovery

After his initial tour of the dilapidated 1850s-era Battle House Hotel, Ron Blount, construction manager with Retirement Systems of Alabama, said to his boss: “You need a priest more than you need a contractor.” Those words were more prescient to RSA's restoration of the historic Mobile landmark than he could have known at the time.

| Aug 11, 2010

Lifestyle Hotel Trends Around the World

When the Rocco Forte Collection opens the Verdura Golf & Spa Resort in Sicily in early 2009, the 200-room luxury property will be one of the world's newest lifestyle hotels. Lifestyle hotels cater to guests seeking a heightened travel experience, which they deliver by offering distinctive—some would say avant-garde, or even outrageous—architecture, room design, amenities, and en...

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021