flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Detroit's tallest tower to rise at site of former J.L Hudson's Department Store

High-rise Construction

Detroit's tallest tower to rise at site of former J.L Hudson's Department Store

SHoP Architects and Hamilton Anderson Associates will design the 52-story building.


By David Malone, Associate Editor | March 3, 2017

Rendering courtesy of SHoP Architects Bedrock Detroit

J.L. Hudson’s Department Store was one of the premier locations in the heart of downtown Detroit in the 1970s and 1980s. After closing in 1983, however, it has sat as one of the few vacant sites in downtown Detroit.

But the site is about to be vacant no longer, as a new design from SHoP Architects and Hamilton Anderson Associates calls for a 52-story mixed-use building to rise and create a new destination location in the heart of Detroit.

The building, which will stretch 734-feet into the sky and become Detroit’s tallest tower, will offer 250 residential units totaling 441,500 GSF. A nine-story, 176-foot podium will contain another 733,823 GSF for use as commercial, office, technology, and arts and culture space. An additional three stories will be located below grade and comprise more commercial space and 700 parking spots. About two-thirds of the first underground floor will be used as a market. The remainder of the first underground floor, as well as the second and third floors, will be used for parking. In total, the building will provide 1.2 million GSF.

The Hudson’s Site building will be one of the largest construction projects in Detroit in decades and will attempt to once again turn the Woodward Avenue site into a premier location in the city. The new mixed-use tower is expected to attract visitors, create thousands of jobs, and lure talent, business, and investment opportunities. Bedrock Detroit, the project’s developer, estimates the project will create 5,800 jobs during the construction phase and 3,000 new permanent jobs. It is also estimated the Hudson’s Site project will create $560 million in annual economic output.

The Downtown Development Authority was presented with plans for the site and has approved the timeline for the groundbreaking of the development by Dec. 1, 2017.

 

Rendering courtesy of SHoP Architects and Bedrock Detroit.

 

Rendering courtesy of SHoP Architects and Bedrock Detroit.

 

Rendering courtesy of Bedrock Detroit.

 

Rendering courtesy of SHoP Architects and Bedrock Detroit.

 

Rendering courtesy of SHoP Architects and Bedrock Detroit.

Related Stories

| Jun 17, 2014

World's tallest pair of towers to serve as 'environmental catalyst' for China

The Phoenix Towers are expected to reach 1 km, the same height as Adrian Smith and Gordon Gill's Kingdom Tower, but would set a record for multiple towers in one development.

| Jun 6, 2014

KPF, Kevin Roche unveil design for 51-story Hudson Yards tower in NYC [slideshow]

Related Companies and Oxford Properties Group are teaming to develop Fifty Five Hudson Yards, the latest addition to the commercial office tower collection in the 28-acre Hudson Yards development—the largest private real estate development in the history of the U.S.

| Jun 3, 2014

Libeskind's latest skyscraper breaks ground in the Philippines

The Century Spire, Daniel Libeskind's latest project, has just broken ground in Century City, southwest of Manila. It is meant to accommodate apartments and offices.

| May 29, 2014

Wood advocacy groups release 'lessons learned' report on tall wood buildings

The wood-industry advocacy group reThink Wood has released "Summary Report: Survey of International Tall Wood Buildings," with informatino from 10 mid-rise projects in Europe, Australia, and Canada. 

| May 29, 2014

Five finalists, including SOM and Zaha Hadid, chosen in competition for Sweden's tallest skyscraper

In Sernecke's competition to design Sweden's tallest skyscraper, five finalists have been selected: Manuelle Gautrand Architects, Ian Simpson Architects, SOM, Wingårdhs Arkitektkontor, and Zaha Hadid Architects.

| May 28, 2014

KPF's dual towers in Turkey will incorporate motifs, symbols of Ottoman Empire

The two-building headquarters for Turkey’s largest and oldest financial institution, Ziraat Bank, is inspired by the country’s cultural heritage. 

| May 20, 2014

Kinetic Architecture: New book explores innovations in active façades

The book, co-authored by Arup's Russell Fortmeyer, illustrates the various ways architects, consultants, and engineers approach energy and comfort by manipulating air, water, and light through the layers of passive and active building envelope systems.

| May 2, 2014

Norwegian modular project set to be world's tallest timber-frame apartment building [slideshow]

A 14-story luxury apartment block in central Bergen, Norway, will be the world's tallest timber-framed multifamily project, at 49 meters (160 feet). 

| May 1, 2014

Chinese spec 'world's fastest' elevators for supertall project

Hitachi Elevator Co. will build and install 95 elevators—including two that the manufacturer labels as the "world's fastest"—for the Kohn Pedersen Fox-designed Guangzhou CTF Finance Center. 

Smart Buildings | Apr 28, 2014

Cities Alive: Arup report examines latest trends in urban green spaces

From vertical farming to glowing trees (yes, glowing trees), Arup engineers imagine the future of green infrastructure in cities across the world.

boombox1
boombox2
native1

More In Category




Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021