Five years ago, developer Sharif El-Gamal found himself the target of public and political opprobrium when his company, Soho Properties, proposed building Park51, a 15-story Islamic Center and mosque two blocks from the Ground Zero site where the World Trade Center towers were destroyed by the deadliest terrorist attack in the country’s history.
On that same lot—45 Park Place in lower Manhattan, for which El-Gamal paid only $4.85 million in 2009—Soho now proposes to build a 70-story, 667-foot-tall glass condominium tower. According to Bloomberg Business, the skyscraper would offer at least 15 full-floor units of 3,200 to 3,700 sf each, with an average price tag of $3,000 per square foot. The total number of units being proposed was not disclosed.
If the building and pricing are approved, this project is expected to break ground by the end of this year, start selling units early next year, and be completed in 2017. Michael Abboud of the architectural firm SOMA designed the building. The Italian designer Piero Lissoni will design the interiors. Ismael Leyva Architects reportedly is converting SOMA’s exterior design concepts into floor layouts and detailed construction plans.
The proposal calls for 12-foot-tall windows and unobstructed views to the north that begin at close to 300 feet. There will be a 50-foot swimming pool in the basement, concierge service, and a high-ceilinged private lounge.
Bloomberg also reports that Soho still plans to build a three-story Islamic museum and prayer space that would be connected to the tower via a public plaza.
Soho Properties first disclosed preliminary plans for its tower in August 2014, but was still feeling the sting of negative press surrounding the Islamic Center controversy. Those preliminary plans, though, called for a 39-story, 48-unit condo building, considerably shorter than the tower Soho wants to build now.
Soho is attempting to strike while the luxury condo boom is still hot. Home prices in downtown have risen by 28% since 2012. StreetEasy.com, which tracks sales and pricing activity in New York, estimates that homes in the downtown area are on the market for an average of 56 days before they’re sold, or about half the time it took in 2012.
About 5,500 units are being planned or are under construction in the downtown area south of Chambers Street, which suggests that Soho’s proposed tower would run the risk of jumping into a very crowded field.
Related Stories
MFPRO+ New Projects | Oct 30, 2024
BIG’s One High Line finally reaches completion in New York City’s West Chelsea neighborhood
One High Line, a luxury residential project spanning a full city block in New York’s West Chelsea neighborhood, reached completion this summer following years of delays related to investor lawsuits.
MFPRO+ New Projects | Oct 30, 2024
Luxury waterfront tower in Brooklyn features East River and Manhattan skyline views
Leasing recently began for The Dupont, a 41-story luxury rental property along the Brooklyn, N.Y., waterfront. Located within the 22-acre Greenpoint Landing, where it overlooks the newly constructed Newtown Barge Park, the high-rise features East River and Manhattan skyline views along with 20,000 sf of indoor and outdoor communal space.
Multifamily Housing | Oct 28, 2024
A case for mid-rise: How multifamily housing can reshape our cities
Often referred to as “five-over-ones,” the mid-rise apartment type is typically comprised of five stories of apartments on top of a concrete “podium” of ground-floor retail. The main criticism of the “five-over-one” is that they are often too predictable.
Adaptive Reuse | Oct 22, 2024
Adaptive reuse project transforms 1840s-era mill building into rental housing
A recently opened multifamily property in Lawrence, Mass., is an adaptive reuse of an 1840s-era mill building. Stone Mill Lofts is one of the first all-electric mixed-income multifamily properties in Massachusetts. The all-electric building meets ambitious modern energy codes and stringent National Park Service historic preservation guidelines.
MFPRO+ News | Oct 22, 2024
Project financing tempers robust demand for multifamily housing
AEC Giants with multifamily practices report that the sector has been struggling over the past year, despite the high demand for housing, especially affordable products.
Products and Materials | Oct 17, 2024
5 multifamily tech products for your next project
Multifamily housing and technological upgrades go hand-in-hand. From the rise in electric vehicle charging needs to the sophistication of smart home accessories, tech products are abound in the multifamily space.
Codes and Standards | Oct 16, 2024
North Carolina’s code policies likely worsened damage caused by Hurricane Helene
The North Carolina Legislature’s rejection of building code updates likely worsened the damage caused by Hurricane Helene, code experts say. Over the past 15 years, lawmakers rejected limits on construction on steep slopes, which might have reduced the number of homes destroyed by landslides.
MFPRO+ News | Oct 16, 2024
One-third of young adults say hurricanes like Helene and Milton will impact where they choose to live
Nearly one-third of U.S. residents between 18 and 34 years old say they are reconsidering where they want to move after seeing the damage wrought by Hurricane Helene, according to a Redfin report. About 15% of those over age 35 echoed their younger cohort’s sentiment.
Student Housing | Oct 9, 2024
University of Maryland begins work on $148 million graduate student housing development
The University of Maryland, in partnership with Campus Apartments and Mosaic Development Partners, has broken ground on a $148.75 million graduate student housing project on the university’s flagship College Park campus. The project will add 741 beds in 465 fully furnished apartments.
MFPRO+ News | Oct 9, 2024
San Francisco unveils guidelines to streamline office-to-residential conversions
The San Francisco Department of Building Inspection announced a series of new building code guidelines clarifying adaptive reuse code provisions and exceptions for converting office-to-residential buildings. Developed in response to the Commercial to Residential Adaptive Reuse program established in July 2023, the guidelines aim to increase the viability of converting underutilized office buildings into housing by reducing regulatory barriers in specific zoning districts downtown.