flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Developers reveal plans for 1,422-foot-tall skyscraper in Chicago

High-rise Construction

Developers reveal plans for 1,422-foot-tall skyscraper in Chicago

The tower would be the second tallest in the city.


By David Malone, Associate Editor | April 17, 2018
Planned Tribune Tower skyscraper next to Trump tower

Rendering courtesy Golub & Co. and CIM Group

The city known as the birthplace of the skyscraper has plans to build a new 1,422-foot-tall addition to its already impressive high-rise collection. On Monday, developers Golub & Co. and CIM Group unveiled plans to build a mixed-use tower as part of the $1 billion Tribune Tower redevelopment.

The skyscraper, as planned, would become the second tallest in Chicago, missing out on eclipsing the perennial title holder, the Willis Tower, by just 29 feet. According to the developers, the new tower will include 439 rental units, 125 condo units, a five-star boutique hotel comprising 200 rooms, and 10,700 sf of retail space. Construction is planned for a site east of Tribune Tower.

 

Chicago skyline with the new Tribune Tower Skyscraper includedRendering courtesy Golub & Co. and CIM Group.

 

Tribune Tower’s own redevelopment plan calls for the creation of 163 condos and 47,500 sf of retail space. The new skyscraper is tentatively scheduled to begin construction in late 2019 or early 2020.

Adrian Smith + Gordon Gill Architecture designed the new tower while Solomon Cordwell Buenz designed the Tribune Tower redevelopment plans.

 

See Also: The Yard at Chicago Shakespeare to begin construction this spring at Navy Pier

 

Planned Tribune Tower skyscraperRendering courtesy Golub & Co. and CIM Group.

 

Courtesy Golub & Co. and CIM Group.

Related Stories

| Feb 13, 2013

'Vegetative tower' apartments to revive NYC site

A Manhattan site formerly slated for development with a "tower of cubes"—a now-defunct project by Santiago Calatrava—will be revived with a 998-foot, 300,000-sf apartment building by Morali Architects.

| Jul 9, 2012

Modular Construction Delivers Model for New York Housing in Record Time

A 65-unit supportive housing facility in Brooklyn, N.Y., was completed in record time using modular construction with six stories set in just 12 days.

| Jul 2, 2012

San Francisco lays claim to the greenest building in North America

The 13-floor building can hold around 900 people, but consumes 60% less water and 32% less energy than most buildings of its kind.

| Jun 13, 2012

Thornton Tomasetti founding principals receive CTBUH Fazlur R. Khan Lifetime Achievement Medal

This is the first time the CTBUH Board of Trustees has awarded the prize to two individuals jointly.

| Jun 6, 2012

KPF designs tower for Yongsan IBD

The master plan, created by Studio Daniel Libeskind, is a dynamic urban environment containing contributions from 19 different architects practicing in diverse locations around the globe.

| Jun 6, 2012

SOM urges Chicago tenants to partner with landlords to cut energy use

Tenants can exceed building energy challenge targets recently announced by Mayor Emanuel.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

boombox1
boombox2
native1

More In Category




Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021