DLR Group’s intelligent air quality platform, sonrai IAQ™ has integrated Atrius solutions as an energy management component to their services. This allows sonrai IAQ clients to now benchmark energy effectiveness, validate utility expenses, and assess resource usage in the context of maintaining safe, comfortable, and high-performing indoor environments.
"Now that sonrai IAQ has been established as a global best-in-class air quality analytics platform, the natural next step was to partner with a best-in-class energy management solution. Atrius® Building Insights is a powerful energy management platform trusted by the world’s leading organizations to manage resource use and carbon emissions," said DLR Group Smart Buildings Leader, Ruairi Barnwell. "Integrating Atrius to the sonrai eco-system adds context around the energy consumption and carbon emissions that support these healthy indoor environments for all of our sonrai IAQ clients."
sonrai IAQ™ hosts the largest database of 3rd-party-verified, real-time air quality data in the world, including:
- The most RESET Air Certified square footage in North America
- The first RESET Air Certified project in the United States at the Chicago Merchandise Mart (2016)
- The largest commercial office building in the world to achieve RESET Air Certification ( Sterling Bay's One Two PRU in Chicago, IL)
sonrai IAQ is being used with the integrated Atrius module in Sterling Bay’s national commercial real estate portfolio and a variety of other clients across DLR Group’s core sectors.
"Our collaboration with DLR Group is the first step in providing organizations better access to data around their indoor air quality. Over time, we expect building operators to demand and require increasingly better access to energy and performance data, as a critical component of making our built environment smarter, safer, and greener,” said Andrew Blauvelt, Vice President at Atrius.
As buildings become more complex, they demand more than a one-size-fits-all approach to facility management. sonrai IAQ and Atrius Building Insights delivers greater compatibility with existing infrastructure. Teams can capture and analyze disparate data flows in real-time, bringing once static data to life. The resulting actionable intelligence proactively informs and automates optimal system performance, balancing energy consumption, carbon emissions, and indoor environmental quality.
Related Stories
| Aug 11, 2010
200 Fillmore
Built in 1963, the 32,000-sf 200 Fillmore building in Denver housed office and retail in a drab, outdated, and energy-splurging shell—a “style” made doubly disastrous by 200 Fillmore's function as the backdrop for a popular public plaza and outdoor café called “The Beach.
| Aug 11, 2010
Integrated Project Delivery builds a brave, new BIM world
Three-dimensional information, such as that provided by building information modeling, allows all members of the Building Team to visualize the many components of a project and how they work together. BIM and other 3D tools convey the idea and intent of the designer to the entire Building Team and lay the groundwork for integrated project delivery.
| Aug 11, 2010
High Tech High International used to be a military facility
High Tech High International, reconstructed inside a 1952 Navy metal foundry training facility, incorporates the very latest in teaching technology with a centerpiece classroom known as the UN Theater, which is modeled after the UN chambers in New York. The interior space, which looks more like a hip advertising studio than a public high school, provides informal, flexible seating areas, abunda...
| Aug 11, 2010
Putting the Metal to the Petal
The Holocaust and Human Rights Center of Maine was founded in 1985, but the organization didn't have a permanent home until May 2008. That's when the Michael Klahr Center, which houses the HHRC, opened on the Augusta campus of the University of Maine. The design, by Boston-based architects Shepley Bulfinch Richardson & Abbott, was selected from among more than 200 entries in a university-s...
| Aug 11, 2010
Great Solutions: BIM/Information Technology
4. Architectural Visualization through Gaming Technology Before 3D walkthroughs for client presentations were popular, HKS manager of Advanced Technologies Pat Carmichael and his team were working to marry gaming engines with 3D building models. "What's being tasked to us more and more is not just to show design, but to show function," Carmichael said.
| Aug 11, 2010
The softer side of Sears
Built in 1928 as a shining Art Deco beacon for the upper Midwest, the Sears building in Minneapolis—with its 16-story central tower, department store, catalog center, and warehouse—served customers throughout the Twin Cities area for more than 65 years. But as nearby neighborhoods deteriorated and the catalog operation was shut down, by 1994 the once-grand structure was reduced to ...
| Aug 11, 2010
Jefferson Would Be Proud
The Virginia State Capitol Building—originally designed by Thomas Jefferson and almost as old as the nation itself—has proudly served as the oldest continuously used Capitol in the U.S. But more than two centuries of wear and tear put the historical landmark at the head of the line for restoration.
| Aug 11, 2010
Let There Be Daylight
The new public library in Champaign, Ill., is drawing 2,100 patrons a day, up from 1,600 in 2007. The 122,600-sf facility, which opened in January 2008, certainly benefits from amenities that the old 40,000-sf library didn't have—electronic check-in and check-out, new computers, an onsite coffeehouse.
| Aug 11, 2010
American Tobacco Project: Turning over a new leaf
As part of a major revitalization of downtown Durham, N.C., locally based Capitol Broadcasting Company decided to transform the American Tobacco Company's derelict 16-acre industrial plant, which symbolized the city for more than a century, into a lively and attractive mixed-use development. Although tearing down and rebuilding the property would have made more economic sense, the greater goal ...
| Aug 11, 2010
Great Solutions: Healthcare
11. Operating Room-Integrated MRI will Help Neurosurgeons Get it Right the First Time A major limitation of traditional brain cancer surgery is the lack of scanning capability in the operating room. Neurosurgeons do their best to visually identify and remove the cancerous tissue, but only an MRI scan will confirm if the operation was a complete success or not.