flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

DLR Group and Atrius collaborate on smarter, healthier building spaces

Building Team

DLR Group and Atrius collaborate on smarter, healthier building spaces

DLR Group and Atrius announce strategic collaboration to make the industry’s leading air quality analytics platform even more powerful.


By DLR Group | November 23, 2021
sonrai IAQ
Courtesy DLR Group

DLR Group’s intelligent air quality platform, sonrai IAQ™ has integrated Atrius solutions as an energy management component to their services. This allows sonrai IAQ clients to now benchmark energy effectiveness, validate utility expenses, and assess resource usage in the context of maintaining safe, comfortable, and high-performing indoor environments.

"Now that sonrai IAQ has been established as a global best-in-class air quality analytics platform, the natural next step was to partner with a best-in-class energy management solution. Atrius® Building Insights is a powerful energy management platform trusted by the world’s leading organizations to manage resource use and carbon emissions," said DLR Group Smart Buildings Leader, Ruairi Barnwell.  "Integrating Atrius to the sonrai eco-system adds context around the energy consumption and carbon emissions that support these healthy indoor environments for all of our sonrai IAQ clients."

sonrai IAQ™ hosts the largest database of 3rd-party-verified, real-time air quality data in the world, including:

  • The most RESET Air Certified square footage in North America
  • The first RESET Air Certified project in the United States at the Chicago Merchandise Mart (2016)
  • The largest commercial office building in the world to achieve RESET Air Certification ( Sterling Bay's One Two PRU in Chicago, IL)

sonrai IAQ is being used with the integrated Atrius module in Sterling Bay’s national commercial real estate portfolio and a variety of other clients across DLR Group’s core sectors.

"Our collaboration with DLR Group is the first step in providing organizations better access to data around their indoor air quality. Over time, we expect building operators to demand and require increasingly better access to energy and performance data, as a critical component of making our built environment smarter, safer, and greener,” said Andrew Blauvelt, Vice President at Atrius.

As buildings become more complex, they demand more than a one-size-fits-all approach to facility management. sonrai IAQ and Atrius Building Insights delivers greater compatibility with existing infrastructure. Teams can capture and analyze disparate data flows in real-time, bringing once static data to life. The resulting actionable intelligence proactively informs and automates optimal system performance, balancing energy consumption, carbon emissions, and indoor environmental quality.

Related Stories

| Aug 11, 2010

The pride of Pasadena

As a shining symbol of civic pride in Los Angeles County, Pasadena City Hall stood as the stately centerpiece of Pasadena's Civic Center since 1927. To the casual observer, the rectangular edifice, designed by San Francisco Classicists John Bakewell, Jr., and Arthur Brown, Jr., appeared to be aging gracefully.

| Aug 11, 2010

9 Rooftop Photovoltaic Installation Tips

The popularity of rooftop photovoltaic (PV) panels has exploded during the past decade as Building Teams look to maximize building energy efficiency, implement renewable energy measures, and achieve green building certification for their projects. However, installing rooftop PV systems—rack-mounted, roof-bearing, or fully integrated systems—requires careful consideration to avoid d...

| Aug 11, 2010

Education's Big Upgrade

Forty-five percent of the country's elementary, middle, and high schools were built between 1950 and 1969 and will soon reach the end of their usefulness, according to the 2005–2008 K-12 School Market for Design & Construction Firms, published by ZweigWhite, a Massachusetts-based market-research firm.

| Aug 11, 2010

Burr Elementary School

In planning the Burr Elementary School in Fairfield, Conn., the school's building committee heeded the words of William Wordsworth: Come forth into the light of things, let nature be your teacher. They selected construction manager Turner Construction Company, New York, and the New York office of A/E firm Skidmore, Owings & Merrill to integrate nature on the heavily wooded 15.

| Aug 11, 2010

Bronze Award: Trenton Daylight/Twilight High School Trenton, N.J.

The story of the Trenton Daylight/Twilight High School is one of renewal and rebirth—both of the classic buildings that symbolize the city's past and the youth that represent its future. The $39 million, 101,000-sf urban infill project locates the high school—which serves recent dropouts and students who are at risk of dropping out—within three existing vacant buildings.

| Aug 11, 2010

New school designs don't go by the book

America needs more schools. Forty-five percent of the nation's elementary, middle, and high schools were built between 1950 and 1969, according market research firm ZweigWhite, Natick, Mass. Yet even as the stock of K-12 schools ages and declines, school enrollments continue to climb. The National Center for Education Statistics predicts that enrollment in public K-12 schools will keep rising...

| Aug 11, 2010

Bronze Award: Lincoln High School Tacoma, Wash.

Lincoln High School in Tacoma, Wash., was built in 1913 and spent nearly a century morphing into a patchwork of outdated and confusing additions. A few years ago, the Tacoma School District picked Lincoln High School, dubbed “Old Main,” to be the first high school in the district to be part of its newly launched Small Learning Communities program.

| Aug 11, 2010

Great Solutions: Technology

19. Hybrid Geothermal Technology The team at Stantec saved $800,000 in construction costs by embedding geothermal piping into the structural piles at the WestJet office complex in Calgary, Alb., rather than drilling boreholes adjacent to the building site, which is the standard approach. Regular geothermal installation would have required about 200 boreholes, each about four-inches in diameter ...

| Aug 11, 2010

Cronkite Communication School Speaks to Phoenix Redevelopment

The city of Phoenix has sprawling suburbs, but its outward expansion caused the downtown core to stagnate—a problem not uncommon to other major metropolitan areas. Reviving the city became a hotbed issue for Mayor Phil Gordon, who envisioned a vibrant downtown that offered opportunities for living, working, learning, and playing.

| Aug 11, 2010

Bronze Award: Hawthorne Elementary School, Elmhurst, Ill.

At 121 years, Hawthorne School is the oldest elementary school building in the Elmhurst, Ill., school district and a source of pride for the community. Unfortunately, decades of modifications and short-sighted planning had rendered it dysfunctional in terms of modern educational delivery. At the same time, increasing enrollment was leading to overcrowding, with the result that the library, for ...

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021