flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Dominican Republic airport expansion will add mixed-use features

Airports

Dominican Republic airport expansion will add mixed-use features

The airport design is inspired by regional beauty and culture.


By Peter Fabris, Contributing Editor | April 4, 2022
STI ext 1
The expansion of the Santiago International Airport will include an office park, business center, and hotel.
The recently revealed design concept for the expansion of Santiago International Airport in the Dominican Republic includes a transformation of the current building into a mixed-use space that features an office park, business center, and hotel.
 
Design of the $300 million project, totaling 592,000 sf, by luis vidal + architects, takes inspiration from the natural beauty and culture of the Caribbean region. The expansion will improve the efficient flow of passengers, accommodating as many as four million travelers when it opens—resulting in a doubling of current capability. The expansion will also increase capacity for cargo, providing an accelerant for regional trade. 
 
STI Design
The design will improve the flow of the passengers.

STI design 2

The terminal expansion will include expanded check-in and ticketing, advanced security and baggage operations, and new outdoor green areas. It will also provide more space for aircraft parking and extend the airport runway to 9,800 feet, which can accommodate larger aircraft.

Passenger Efficiency
Passenger efficiency was taken into consideration when designing the expansion of STI.

New terminal features include:

 
·Nine contact stands in the airport’s apron where an aircraft could use a passenger boarding bridge if desired by the airline. Each is designed on two levels to segregate the flow of departures from arrivals.
·One mile of new roads.
·Over 150,000 sf of green space.
·A raised parking area connected to the new terminal.
·Airport offices and an expansive commercial, hotel, and business center featuring restaurants and food options.
·An elevated and independent access road that leads to the check-in on level two, while another access road connects everything to the pre-existing building and the arrivals hall on level one.
 
The terminal’s architecture will blend with the curves of the surrounding landscape, inspired by the linearity of the harvest fields of bananas, tobacco, and coffee. The region’s backdrop is recreated within the terminal. The interior ceilings emulate shade from vegetation, with more than 8 million pounds of timber making up the roofing structure.
 
Owner and/or developer: Aeropuerto Internacional del Cibao (AIC)
Design architect: luis vidal + architects
Architect of record: luis vidal + architects
MEP engineer: AAS-ERMES / INICA
Structural engineer: OPTIMUM ENGINEER
General contractor/construction manager: Not yet awarded

Related Stories

| Jan 11, 2014

Getting to net-zero energy with brick masonry construction [AIA course]

When targeting net-zero energy performance, AEC professionals are advised to tackle energy demand first. This AIA course covers brick masonry's role in reducing energy consumption in buildings. 

| Dec 13, 2013

Safe and sound: 10 solutions for fire and life safety

From a dual fire-CO detector to an aspiration-sensing fire alarm, BD+C editors present a roundup of new fire and life safety products and technologies. 

| Dec 10, 2013

16 great solutions for architects, engineers, and contractors

From a crowd-funded smart shovel to a why-didn’t-someone-do-this-sooner scheme for managing traffic in public restrooms, these ideas are noteworthy for creative problem-solving. Here are some of the most intriguing innovations the BD+C community has brought to our attention this year.

| Nov 27, 2013

Wonder walls: 13 choices for the building envelope

BD+C editors present a roundup of the latest technologies and applications in exterior wall systems, from a tapered metal wall installation in Oklahoma to a textured precast concrete solution in North Carolina. 

| Nov 26, 2013

Construction costs rise for 22nd straight month in November

Construction costs in North America rose for the 22nd consecutive month in November as labor costs continued to increase, amid growing industry concern over the tight availability of skilled workers.

| Nov 25, 2013

Building Teams need to help owners avoid 'operational stray'

"Operational stray" occurs when a building’s MEP systems don’t work the way they should. Even the most well-designed and constructed building can stray from perfection—and that can cost the owner a ton in unnecessary utility costs. But help is on the way.

| Nov 19, 2013

Top 10 green building products for 2014

Assa Abloy's power-over-ethernet access-control locks and Schüco's retrofit façade system are among the products to make BuildingGreen Inc.'s annual Top-10 Green Building Products list. 

| Nov 15, 2013

Metal makes its mark on interior spaces

Beyond its long-standing role as a preferred material for a building’s structure and roof, metal is making its mark on interior spaces as well. 

| Nov 13, 2013

Installed capacity of geothermal heat pumps to grow by 150% by 2020, says study

The worldwide installed capacity of GHP systems will reach 127.4 gigawatts-thermal over the next seven years, growth of nearly 150%, according to a recent report from Navigant Research.

| Oct 30, 2013

11 hot BIM/VDC topics for 2013

If you like to geek out on building information modeling and virtual design and construction, you should enjoy this overview of the top BIM/VDC topics.

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021