Duro-Last provides solution for Kentucky elementary school's leaky roof

Sponsored Content Roofing

Duro-Last provides solution for Kentucky elementary school's leaky roof

The assembly used for this project was Duro-Guard EPS Flute Fill Combo as the base, and then Duro-Guard ISO HD and DensDeck® cover boards. 


By Duro-Last | March 21, 2017

Contractor: JBK Roofing

Project: Lynn Camp Elementary School

Location: Corbin, Kentucky

Square Feet: 119,000

Products: Duro-Fleece®, Duro-Tuff® and Duro-Last® membranes; Vinyl Ribs; Duro-Guard® EPS Flute Fill Combo insulation; Duro-Guard ISO HD insulation, Duro-Guard DensDeck® cover boards, EXCEPTIONAL® Metals accessories and edge details, Duro-Grip® CR-20 adhesive; Duro-Caulk® Advanced

 

 

When roof leaks were starting to interfere with the daily activities of Lynn Camp Elementary School in Corbin, Kentucky, administrators knew it was time for a new roof.

“We had a situation in a lot of the rooms where tiles were molding because of the roof leaks,” said Anthony Pennington, Principal of Lynn Camp Schools. “It was becoming a constant distraction for not only our students but our teachers and their learning process.”

The existing standing seam metal section of the roof was a daunting task at more than 78,000 square feet, but its design and blue color was a look the school was hoping to maintain. However, the projected timeline to complete a metal roof of this size would be 9-12 months, well outside the school’s needs.

Time was of the essence for this project and when JBK Roofing presented a metal retrofit option using the Duro-Last Vinyl Rib system, school administrators knew they had found the right solution.

The assembly used for this project was Duro-Guard EPS Flute Fill Combo as the base, and then Duro-Guard ISO HD and DensDeck® cover boards. Duro-Fleece 50 mil membrane was adhered with Duro-Grip CR-20 adhesive and, lastly, the Vinyl Ribs were heat welded to the adhered membrane.

Being such a large roof, more than 52,000 liner feet of Vinyl Rib was used.

“This is by far the largest and most intense Vinyl Rib project we’ve done,” said Brandon Keck, President of JBK Roofing. “Even so, the Duro-Last system was extremely fast-paced and allowed us to fit in the school’s schedule, taking only 90 days to complete.”

The bright blue color of the Duro-Fleece membrane also gave the school the aesthetic look they wanted. “We wanted something cutting edge, we wanted something that would last a long time and would look amazing for our school,” Pennington said.

Related Stories

Roofing | May 18, 2021

Duro-Last®, Inc. Oregon Facility Receives Prestigious VPP Star Site Renewal and Safety Committee Recognition

Duro-Last, Inc. is pleased to announce that its Grants Pass, Oregon manufacturing facility recently received a renewal on their Star Site status from the Occupational Safety & Health Organization’s (OSHA) Voluntary Protection Program (VPP), earning an exemplary “A+” rating. Originally awarded Star Site status in 2016, this renewal reinforces Duro-Last’s continued commitment to the highest standards of workplace safety.

Coronavirus | Apr 8, 2020

COVID-19 alert: Most U.S. roofing contractors hit by coronavirus, says NRCA

NRCA survey shows 52% of roofing contractor said COVID-19 pandemic was having a significant or very significant impact on their businesses.

Building Technology | Jan 7, 2020

Tariff whiplash for bifacial solar modules

Bifacial solar systems offer many advantages over traditional systems.

75 Top Building Products | Dec 16, 2019

101 Top Products for 2019

Building Design+Construction readers and editors select their top building products for the past 12 months in the fourth-annual 101 Top Products report.

75 Top Building Products | Dec 12, 2019

Top Building Envelope Products for 2019

Sto's beetle-inspired exterior coating and Dörken Systems' UV-resistant vapor-permeable barrier are among the 28 new building envelope products to make Building Design+Construction's 2019 101 Top Products report. 

Sponsored | Roofing | Oct 15, 2019

Should you repair or replace a roof? How to decide

There are a number of key considerations.

boombox1
boombox2
native1

More In Category


Standards

Design guide offers details on rain loads and ponding on roofs

The American Institute of Steel Construction and the Steel Joist Institute recently released a comprehensive roof design guide addressing rain loads and ponding. Design Guide 40, Rain Loads and Ponding provides guidance for designing roof systems to avoid or resist water accumulation and any resulting instability.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021