flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Duro-Last provides solution for Kentucky elementary school's leaky roof

Sponsored Content Roofing

Duro-Last provides solution for Kentucky elementary school's leaky roof

The assembly used for this project was Duro-Guard EPS Flute Fill Combo as the base, and then Duro-Guard ISO HD and DensDeck® cover boards. 


By Duro-Last | March 21, 2017

Contractor: JBK Roofing

Project: Lynn Camp Elementary School

Location: Corbin, Kentucky

Square Feet: 119,000

Products: Duro-Fleece®, Duro-Tuff® and Duro-Last® membranes; Vinyl Ribs; Duro-Guard® EPS Flute Fill Combo insulation; Duro-Guard ISO HD insulation, Duro-Guard DensDeck® cover boards, EXCEPTIONAL® Metals accessories and edge details, Duro-Grip® CR-20 adhesive; Duro-Caulk® Advanced

 

 

When roof leaks were starting to interfere with the daily activities of Lynn Camp Elementary School in Corbin, Kentucky, administrators knew it was time for a new roof.

“We had a situation in a lot of the rooms where tiles were molding because of the roof leaks,” said Anthony Pennington, Principal of Lynn Camp Schools. “It was becoming a constant distraction for not only our students but our teachers and their learning process.”

The existing standing seam metal section of the roof was a daunting task at more than 78,000 square feet, but its design and blue color was a look the school was hoping to maintain. However, the projected timeline to complete a metal roof of this size would be 9-12 months, well outside the school’s needs.

Time was of the essence for this project and when JBK Roofing presented a metal retrofit option using the Duro-Last Vinyl Rib system, school administrators knew they had found the right solution.

The assembly used for this project was Duro-Guard EPS Flute Fill Combo as the base, and then Duro-Guard ISO HD and DensDeck® cover boards. Duro-Fleece 50 mil membrane was adhered with Duro-Grip CR-20 adhesive and, lastly, the Vinyl Ribs were heat welded to the adhered membrane.

Being such a large roof, more than 52,000 liner feet of Vinyl Rib was used.

“This is by far the largest and most intense Vinyl Rib project we’ve done,” said Brandon Keck, President of JBK Roofing. “Even so, the Duro-Last system was extremely fast-paced and allowed us to fit in the school’s schedule, taking only 90 days to complete.”

The bright blue color of the Duro-Fleece membrane also gave the school the aesthetic look they wanted. “We wanted something cutting edge, we wanted something that would last a long time and would look amazing for our school,” Pennington said.

Related Stories

Sponsored | Roofing | Aug 30, 2019

A New Twist on TPO: Firestone UltraPly™ TPO Flex Adhered

The most flexible TPO on the market* makes complex jobs easier.

Sponsored | Roofing | Aug 17, 2018

Owens Corning® FOAMULAR® XPS solution brings game-changing solution to Mercedes-Benz Stadium

Bill Johnson, design principal for HOK, brought together experts from across the country to help realize the revolutionary engineering, design, and functionality envisioned for the $1.5 billion Mercedes-Benz Stadium project.

Sponsored | Roofing | Jul 24, 2018

Metal roofs take the residential market by storm

As metal roofing soars in popularity, so do the aesthetic options. 

Sponsored | Roofing | Jun 22, 2018

U.S. Coast Guard Headquarters - vegetative roof assembly, Washington, D.C.

A cross-functional team collaborated throughout the three-phased VRA construction.

Sponsored | Roofing | Mar 21, 2018

Renovation at Cincinnati Music Hall includes new automatic smoke vents for life safety

Workers tackled a 16-month, $143-million project at Cincinnati Music Hall, and finished the project last October.

Codes and Standards | Nov 16, 2017

White roofing isn’t always the best choice

Adverse effects include heat reflection onto nearby walls.

Green | Sep 12, 2017

Brooklyn’s Windsor Terrace Library gets a living roof

The roof was funded through a process that allows local residents to decide how City capital dollars are spent in their neighborhoods.

Building Enclosure Systems | Jul 26, 2017

Balcony and roof railings and the code: Maintain, repair, or replace? [AIA course]

Lacking familiarity with current requirements, some owners or managers complete a roof or balcony rehabilitation, only to learn after the fact that they need to tear noncompliant railings out of their new roof or terrace and install new ones. 

Roofing | Jul 17, 2017

EclipseEdge eases installation of raised roof edges, gravel stops, and full coping caps

The EclipseEdge edge metal profile uses a two-part design with a base and a top cover to eliminate steps often required in traditional installations. 

boombox1
boombox2
native1

More In Category


Standards

Design guide offers details on rain loads and ponding on roofs

The American Institute of Steel Construction and the Steel Joist Institute recently released a comprehensive roof design guide addressing rain loads and ponding. Design Guide 40, Rain Loads and Ponding provides guidance for designing roof systems to avoid or resist water accumulation and any resulting instability.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021