flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Easy net-zero energy buildings [infographic]

Easy net-zero energy buildings [infographic]

"Be a Zero Hero" infographic educates building industry professionals on ultra energy-efficient structural insulated panel construction


By Premier SIPS by Insulfoam | May 14, 2013

As architects and contractors look for ways to develop energy-efficient buildings, Premier SIPS by Insulfoam offer an engaging infographic on how to achieve more airtight, well-insulated structures. The "Be a Zero Hero" infographic (see below) highlights how structural insulated panel construction is 15 times more air tight and offers 47% greater insulation performance than traditional stick framing.

"One thing that surprises many people we speak with, is how affordable net-zero energy construction can be," said Joe Pasma, technical director for Premier SIPS. "The methods exist today and are often straightforward and cost effective, whether for homes, apartments, schools or other institutional and commercial buildings. We wanted to create an easy-to-share graphic that inspires and educates building professionals on uses of available technologies for reducing heating and cooling costs."

 

 

 

Be A Zero Hero: A Simple and Fast Way to Energy Efficient Buildings - An infographic by the Structural Insulated Panels team at PremierSIPs.


About Premier SIPs by Insulfoam
Premier SIPS by Insulfoam leads the construction industry in the research, development and manufacturing of high-performance, energy-efficient structural insulated panels (SIPs) and related materials. As one of North America's largest SIP manufacturers, the company is a leader in working with design professionals, contractors and code officials on innovative SIP applications. For more information about Premier SIPS, call (800) 275-7086 or visit their website.

Related Stories

| Nov 29, 2011

Turner Construction establishes partnership with Clark Builders

Partnership advances growth in the Canadian marketplace.

| Nov 29, 2011

AIA launches stalled projects database

To populate this database with both stalled projects and investors interested in financing them, the AIA in the last week initiated a communications campaign to solicit information about stalled projects around the country from its members and allied professionals.

| Nov 28, 2011

Leo A Daly and McCarthy Building complete Casino Del Sol expansion in Tucson, Ariz.

Firms partner with Pascua Yaqui Tribe to bring new $130 million Hotel, Spa & Convention Center to the Tucson, Ariz., community.

| Nov 28, 2011

Armstrong acquires Simplex Ceilings

Simplex will become part of the Armstrong Building Products division.

| Nov 28, 2011

Nauset Construction completes addition for Franciscan Hospital for Children

The $6.5 million fast-track, urban design-build projectwas completed in just over 16 months in a highly sensitive, occupied and operational medical environment.

| Nov 23, 2011

Lord, Aeck & Sargent opens fourth U.S. office, acquiring architecture firm in Austin, Texas

Strategic move offers growth opportunity and strengthens the firm’s historic preservation portfolio.

| Nov 23, 2011

Griffin Electric completes Gwinnett Tech project

Accommodating up to 3,000 students annually beginning this fall, the 78,000-sf, three-story facility consists of thirteen classrooms and twelve high-tech laboratories, in addition to several lecture halls and faculty offices.

| Nov 22, 2011

Corporate America adopting revolutionary technology

The survey also found that by 2015, the standard of square feet allocated per employee is expected to drop from 200 to estimates ranging from 50 to 100 square feet per person dependent upon the industry sector. 

| Nov 22, 2011

Report finds that L.A. lags on solar energy, offers policy solutions

Despite robust training programs, L.A. lacks solar jobs; lost opportunity for workers in high-need communities.

| Nov 22, 2011

Saskatchewan's $1.24 billion carbon-capture project

The government of Saskatchewan has approved construction of the Boundary Dam Integrated Carbon Capture and Storage Demonstration Project.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021