flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Easy net-zero energy buildings [infographic]

Easy net-zero energy buildings [infographic]

"Be a Zero Hero" infographic educates building industry professionals on ultra energy-efficient structural insulated panel construction


By Premier SIPS by Insulfoam | May 14, 2013

As architects and contractors look for ways to develop energy-efficient buildings, Premier SIPS by Insulfoam offer an engaging infographic on how to achieve more airtight, well-insulated structures. The "Be a Zero Hero" infographic (see below) highlights how structural insulated panel construction is 15 times more air tight and offers 47% greater insulation performance than traditional stick framing.

"One thing that surprises many people we speak with, is how affordable net-zero energy construction can be," said Joe Pasma, technical director for Premier SIPS. "The methods exist today and are often straightforward and cost effective, whether for homes, apartments, schools or other institutional and commercial buildings. We wanted to create an easy-to-share graphic that inspires and educates building professionals on uses of available technologies for reducing heating and cooling costs."

 

 

 

Be A Zero Hero: A Simple and Fast Way to Energy Efficient Buildings - An infographic by the Structural Insulated Panels team at PremierSIPs.


About Premier SIPs by Insulfoam
Premier SIPS by Insulfoam leads the construction industry in the research, development and manufacturing of high-performance, energy-efficient structural insulated panels (SIPs) and related materials. As one of North America's largest SIP manufacturers, the company is a leader in working with design professionals, contractors and code officials on innovative SIP applications. For more information about Premier SIPS, call (800) 275-7086 or visit their website.

Related Stories

| Nov 14, 2011

Griffin Electric completes electrical work at Cary Arts Center

  The Griffin Electric team was responsible for replacing the previous electrical service on-site with a 1000A, 480/277V service and providing electrical feeds for a new fire pump chiller, six air-handlers and two elevators.

| Nov 14, 2011

303 East 33rd Street building achieves LEED-NC

  The 165,000 sf 12-story residential building is the first green development to be LEED certified in the Murray Hill neighborhood of Manhattan.

| Nov 14, 2011

VanSumeren appointed to Traco general manager

VanSumeren will draw on his more than 20 years of experience in manufacturing management and engineering to deliver operational and service excellence and drive profitable growth for Traco. 

| Nov 11, 2011

By the Numbers

What do ‘46.9,’ ‘886.2,’ and ‘171,271’ mean to you? Check here for the answer.

| Nov 11, 2011

Streamline Design-build with BIM

How construction manager Barton Malow utilized BIM and design-build to deliver a quick turnaround for Georgia Tech’s new practice facility.

| Nov 11, 2011

AIA: Engineered Brick + Masonry for Commercial Buildings

Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam. 

| Nov 11, 2011

How Your Firm Can Win Federal + Military Projects

The civilian and military branches of the federal government are looking for innovative, smart-thinking AEC firms to design and construct their capital projects. Our sources give you the inside story.

| Nov 10, 2011

BD+C's 28th Annual Reconstruction Awards

A total of 13 projects recognized as part of BD+C's 28th Annual Reconstruction Awards.

| Nov 10, 2011

Grousbeck Center for Students & Technology opens doors

New Perkins School for the Blind Building is dedicated to innovation, interaction, and independence for students.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021