flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Education Building II at UC Riverside receives final approval

University Buildings

Education Building II at UC Riverside receives final approval

Hensel Phelps + CO Architects will be the design-build team for the project.


By David Malone, Associate Editor | May 13, 2021
UCR School of Med Ed II exterior and public plaza

Renderings: CO Architects

The new $84-million Education Building II at UC Riverside has been given final approval for construction. The School of Medicine’s new project is starting immediately and is scheduled to break ground in early summer 2021. It will add 90,000 sf to increase the university’s capacity for training future medical professionals.

The Regents of the University of California also confirmed the selection of Hensel Phelps + CO Architects as the design-build partner for the project. The team was selected by the School of Medicine Education II working group and the UCR Office of Planning, Design, and Construction following a design-build competition.

 

UCR School of Med Ed II exterior at night

 

“At the core of our design and construction efforts is the desire to support, promote, and advance the campus’ vision to create an inclusive and innovative learning environment,” said Eric Bain, Operations Manager for the project, in a release. The design also includes a large outdoor plaza that will unify and define a new School of Medicine precinct on campus.

LEED Platinum certification is being targeted. The building will incorporate solar panels and advanced mechanical systems design and thermally insulating materials.

Related Stories

University Buildings | Sep 28, 2021

Designing for health sciences education: Specialty instruction and human anatomy labs

It is a careful balance within any educational facility to provide both multidisciplinary, multiuse spaces and special-use spaces that serve particular functions.

University Buildings | Sep 7, 2021

Gateway to the West: Kansas City University Center for Medical Education Innovation

Kansas City University Center for Medical Education Innovation uses GKD Omega 1520 metal fabric.

Laboratories | Aug 31, 2021

Pandemic puts science and technology facilities at center stage

Expanding demand for labs and life science space is spurring new construction and improvements in existing buildings.

Giants 400 | Aug 30, 2021

2021 Giants 400 Report: Ranking the largest architecture, engineering, and construction firms in the U.S.

The 2021 Giants 400 Report includes more than 130 rankings across 25 building sectors and specialty categories.

Giants 400 | Aug 26, 2021

2021 University Giants: Top architecture, engineering, and construction firms in the higher education sector

Gensler, AECOM, Turner Construction, and CannonDesign head BD+C's rankings of the nation's largest university sector architecture, engineering, and construction firms, as reported in the 2021 Giants 400 Report.

University Buildings | Aug 19, 2021

School of Medicine completes on California University of Science and Medicine’s new Colton campus

The project was designed and built to address critical public health needs in an underserved region.

Resiliency | Aug 19, 2021

White paper outlines cost-effective flood protection approaches for building owners

A new white paper from Walter P Moore offers an in-depth review of the flood protection process and proven approaches.

University Buildings | Aug 12, 2021

Central Michigan University’s Chippewa Champions Center completes

The project was designed in partnership between Populous and GMB Architecture + Engineering.

boombox1
boombox2
native1

More In Category

Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021