In order to better serve the North American market, EGGER, a wood-based material supplier for the furniture, wood construction, and flooring industries, will invest $700 million over the next decade and a half to build its first U.S. manufacturing facility.
The facility, which will be built in North Carolina’s Davidson County, will be a particleboard manufacturing plant that will enable EGGER to better serve customers in North America and improve access for architects and designers. The new plant is expected to create 770 jobs and will kick off with the first phase of development over the next six years. During this phase 400 jobs will be created with an initial investment of $300 million.
In addition to the jobs the new facility directly creates, it will also provide a benefit the greater Piedmont Triad region as it will work with local wood suppliers to acquire wood byproducts from regional sawmills and work with a wide range of suppliers for additional services.
Construction on the project’s first phase is expected to begin at the end of 2018 with production slated to begin in 2020.
Related Stories
| Nov 5, 2012
Brasfield & Gorrie awarded new steel processing facility for Kloeckner Metals
The construction will take place on a 16-acre greenfield site at ThyssenKrupp Industrial Park in Calvert.
| Jun 1, 2012
New BD+C University Course on Insulated Metal Panels available
By completing this course, you earn 1.0 HSW/SD AIA Learning Units.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| Apr 25, 2012
Bubble skyscraper design aims to purify drinking water
The Freshwater Skyscraper will address the issue of increasing water scarcity through a process known as transpiration
| Dec 19, 2011
Survey: Job growth driving demand for office and industrial real estate in Southern California
Annual USC Lusk Center for Real Estate forecast reveals signs of slow market recovery.
| Nov 22, 2011
Saskatchewan's $1.24 billion carbon-capture project
The government of Saskatchewan has approved construction of the Boundary Dam Integrated Carbon Capture and Storage Demonstration Project.
| Oct 3, 2011
Balance bunker and Phase III projects breaks ground at Mitsubishi Plant in Georgia
The facility, a modification of similar facilities used by Mitsubishi Heavy Industries, Inc. (MHI) in Japan, was designed by a joint design team of engineers and architects from The Austin Company of Cleveland, Ohio, MPSA and MHI.