flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Electrical installation work completed at Rhode Island DMV

Electrical installation work completed at Rhode Island DMV


By By BD+C Staff | September 16, 2011
Wayne J. Griffin Electric, Inc. (Griffin Electric) has recently completed the electrical installation work at the updated Rhode

Wayne J. Griffin Electric, Inc. (Griffin Electric) has recently completed the electrical installation work at the updated Rhode Island Division of Motor Vehicles (DMV) facility in Cranston, RI.
The facility was renovated in order to better the working environment for DMV employees and streamline the experience for Rhode Island drivers. The 78,000-sf building features many earth-friendly attributes, including high-efficiency mechanical systems and daylight dimming sensors, plus incorporates green building materials such as bamboo and recycled carpeting. For the convenience of drivers, the many types of DMV transactions were distributed on three floors, and enhanced waiting and concession areas were created.
Griffin Electric was responsible for installing new power distribution within the building, in addition to systems for tele/data, security and fire notification.  Providence-based Dimeo Construction Co. was the General Contractor on-site, while Lerner Ladds + Bartel, also of Providence, served as the project Architect, and Creative Environment Corp. Consulting Engineers of East Providence was the Electrical Engineer.
“There are an increasing number of projects awarded to us which are built within the LEED certification parameters,” commented Wayne J. Griffin, President of Griffin Electric. “We are glad to be part of any project that is dedicated to the preservation and sustainability of our environment, through the use of earth-friendly materials and procedures.” BD+C

Related Stories

| Nov 10, 2011

Suffolk Construction awarded MBTA transit facility and streetscape project

The 21,000-sf project will feature construction of a cable-stayed pedestrian bridge over Ocean Avenue, an elevated plaza deck above Wonderland MBTA Station, a central plaza, and an at-grade pedestrian crossing over Revere Beach Boulevard

| Nov 10, 2011

Thornton Tomasetti’s Joseph and Choi to co-chair the Council on Tall Buildings and Urban Habitat’s Outrigger Design Working Group

Design guide will describe in detail the application of outriggers within the lateral load resisting systems of tall buildings, effects on building behavior and recommendations for design. 

| Nov 9, 2011

Lincoln Center Pavilion wins national architecture and engineering award

The project team members include owner Lincoln Center for the Performing Arts, New York; design architect and interior designer of the restaurant, Diller Scofidio + Renfro, New York; executive architect, FXFOWLE, New York; and architect and interior designer of the film center, Rockwell Group, New York; structural engineer Arup (AISC Member), New York; and general contractor Turner Construction Company (AISC Member), New York. 

| Nov 9, 2011

Sika Sarnafil Roof Recycling Program recognized by Society of Plastics Engineers

Program leads the industry in recovering and recycling roofing membrane into new roofing products.

| Nov 8, 2011

Transforming a landmark coastal resort

Originally built in 1973, the building had received several alterations over the years but the progressive deterioration caused by the harsh salt water environment had never been addressed.

| Nov 8, 2011

$11 million business incubator Florida Innovation Hub at the University of Florida completed by Charles Perry Partners, Inc.

The facility houses the UF Office of Technology Licensing, UF Tech Connect, other entities, and more than 30 startup technology tenants.

| Nov 4, 2011

Mortenson Construction builds its fifth wind facility In Illinois

Shady Oaks Wind Farm is under construction near Compton, Ill.

| Nov 4, 2011

CSI and ICC Evaluation Service agree to reference GreenFormat in ICC-ES Environmental Reports?

ICC-ES currently references CSI's MasterFormat and other formats in all of its evaluation reports. The MOU will add GreenFormat references.

| Nov 4, 2011

McCarthy completes construction of South Region High School No. 2 in Los Angeles

Despite rain delays and scope changes, the $96.7 million high school was completed nearly two-months ahead of schedule.

boombox1
boombox2
native1

More In Category


Sustainable Design and Construction

Northglenn, a Denver suburb, opens a net zero, all-electric city hall with a mass timber structure

Northglenn, Colo., a Denver suburb, has opened the new Northglenn City Hall—a net zero, fully electric building with a mass timber structure. The 32,600-sf, $33.7 million building houses 60 city staffers. Designed by Anderson Mason Dale Architects, Northglenn City Hall is set to become the first municipal building in Colorado, and one of the first in the country, to achieve the Core certification: a green building rating system overseen by the International Living Future Institute.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021