flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Experiential sportsman’s club set to open in Lakewood, Colo.

Sports and Recreational Facilities

Experiential sportsman’s club set to open in Lakewood, Colo.

Nadel Architecture designed the project.


By David Malone, Managing Editor | September 30, 2021
The Gallery Sportsman's Lounge and Range
Courtesy Nadel Architecture

The Gallery Sportsman’s Club & Range will be the Denver area’s first multi-use, experiential indoor shooting facility. The project will feature a high-tech shooting range, retail, and a coffee bar and lounge.

The Nadel Architecture-designed space will include 15 shooting lanes, eight of which will be tactical lanes; private training rooms; and over 3,000 sf of retail. Full-height glass viewing areas will provide visitors a glimpse into the shooting lanes.

The project looks to forgo the feel and aesthetics of a typical gun range. “We’ve branded an environment to disassociate from the stigma of gun ranges – that is dark, dingy, and unwelcoming to new guests,” said Ryan Weller, Director of Retail, Nadel Architecture, in a release. “The space will feature custom art displays created especially for the brand and utilize the latest advancements in range technology. High-end treatments such as polished concrete, solid wood fixturing, natural stone, and ultra-lux decor will provide a refined look and feel that are sure to elevate the user experience.”

The Gallery Sportsman’s Club and Range is slated for completion in the fourth quarter of 2021.

Related Stories

| Sep 30, 2011

Design your own floor program

Program allows users to choose from a variety of flooring and line accent colors to create unique floor designs to complement any athletic facility. 

| Sep 16, 2011

Largest solar installation completed at Redskins' football stadium

On game days, solar power can provide up to 20% of FedExField’s power.

| Sep 12, 2011

First phase of plan to revitalize Florida's Hialeah Park announced

This is the first project of a master plan developed to revive the historic racetrack. 

| May 25, 2011

Olympic site spurs green building movement in UK

London's environmentally friendly 2012 Olympic venues are fuelling a green building movement in Britain.

| Apr 11, 2011

Wind turbines to generate power for new UNT football stadium

The University of North Texas has received a $2 million grant from the State Energy Conservation Office to install three wind turbines that will feed the electrical grid and provide power to UNT’s new football stadium. 

| Apr 5, 2011

U.S. sports industry leads charge in meeting environmental challenges

The U.S. sports industry generates $414 billion annually. The amount of energy being consumed is not often thought of by fans when heading to the stadium or ballpark, but these stadiums, parks, and arenas use massive quantities of energy. Now sports leagues in North America are making a play to curb the waste and score environmental gains.

| Mar 25, 2011

Qatar World Cup may feature carbon-fiber ‘clouds’

Engineers at Qatar University’s Department of Mechanical and Industrial Engineering are busy developing what they believe could act as artificial “clouds,” man-made saucer-type structures suspended over a given soccer stadium, working to shield tens of thousands of spectators from suffocating summer temperatures that regularly top 115 degrees Fahrenheit.

| Mar 11, 2011

University of Oregon scores with new $227 million basketball arena

The University of Oregon’s Matthew Knight Arena opened January 13 with a men’s basketball game against USC where the Ducks beat the Trojans, 68-62. The $227 million arena, which replaces the school’s 84-year-old McArthur Court, has a seating bowl pitched at 36 degrees to replicate the close-to-the-action feel of the smaller arena it replaced, although this new one accommodates 12,364 fans.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021